Browse
Search
2019-114-E AMS - Bordeaux Construction contract amendment
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-114-E AMS - Bordeaux Construction contract amendment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2019 12:24:35 PM
Creation date
2/26/2019 11:45:55 AM
Metadata
Fields
Template:
Contract
Date
2/15/2019
Contract Starting Date
7/1/2018
Contract Document Type
Contract Amendment
Amount
$15,950.00
Document Relationships
2018-325-E AMS - Bordeaux Construction Co. Northern Campus construction
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
R 2019-114 AMS - Bordeaux Construction contract amendment
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: E0645F9B-3427-4AEC-BOD4-FF7860FOF502 <br /> June 21, 2018 <br /> Page Two <br /> $500.00 per well if recovered. Also, additional time and materials for sealing the cave(s), <br /> including grouting materials, are not included in this estimate. <br /> 4. A water supply of at least 25 gpm is available for use on-site. <br /> 5. Damage to private or other utilities not identified prior to drilling and excavation is not the <br /> responsibility of ARM. <br /> 6. Level D Health and Safety will be required. Level C or above will require halting the project <br /> and re-establishing site safety requirements. <br /> 7. Drilling cuttings will be spread and raked out around the test loop location. <br /> 8. Groundwater encountered during drilling will be discharged to the surface for gravity run-off. <br /> Erosion control will not be needed or required. <br /> If you have any questions or require further information, do not hesitate to call. <br /> Sincerely, <br /> OrZgZnaz 's�Owed <br /> James L. Cornette, P.G., C.W.D. <br /> Project Manager <br /> I have reviewed the above Scope of Services and accept it as presented. <br /> Signature Date <br /> Title <br /> (Please remit a signed copy to ARM. Thank you.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.