Browse
Search
2019-104-E IT - Tower Engineering Professionals engineering survey
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-104-E IT - Tower Engineering Professionals engineering survey
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2019 12:06:33 PM
Creation date
2/26/2019 11:45:09 AM
Metadata
Fields
Template:
Contract
Date
2/20/2019
Contract Starting Date
2/20/2019
Contract Document Type
Agreement - Consulting
Amount
$9,600.00
Document Relationships
R 2019-104 IT - Tower Engineering Professionals engineering survey
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: E3E85C1C-F7DB-4D18-A097-5D3D408C08DA <br /> [Departmental Use Only] <br /> TITLE TowerEngineerSurvey <br /> FY 19 <br /> NORTH CAROLINA <br /> CONSULTING SERVICES AGREEMENT <br /> UNDER $90,000 <br /> ORANGE COUNTY <br /> This Agreement, made and entered into this 20th day of February, 2019, ("Effective Date") <br /> by and between Orange County, North Carolina a body politic and corporate of the State of <br /> North Carolina (hereinafter, the "County") and Tower Engineering Professionals, Inc, <br /> (hereinafter, the "Consultant"). <br /> WITNESSETH: <br /> That the County and Consultant, for the consideration herein named, do hereby agree as <br /> follows: <br /> ARTICLE 1 SCOPE OF WORK <br /> 1.1 Scope of Work <br /> 1.1.1 This Services Agreement ("Agreement") is for professional consulting services to <br /> be rendered by Consultant to County with respect to (insert type of project) <br /> Cedar Grove Fire Tower, 720 Hawkins Road, Cedar Grove,NC <br /> 1) Tower Mapping - tower climb to inventory current tower configuration and antenna loading <br /> 2) Foundation Mapping - Partial excavation of foundation if existing foundation is shallow. <br /> Assumes this will bein conjunction with tower mapping, above. <br /> 3) Rebar Mapping (Option) - Destructive test to find rebar location and size. To be conducted <br /> during foundation mapping, above. <br /> 4) Geotechnical Investigation Rock Core (Option) - (1) 50' soil boring to determine soil <br /> properties to use in the structural analysis. <br /> 5) Rock Core (option) - Core if shallow refusal is encountered. To be conducted during <br /> geotechnical investigation, above. <br /> 6) Structural analysis - If the tower analysis fails, additional fees apply if a modification design is <br /> requested. <br /> 1.1.2 By executing this Agreement, the Consultant represents and agrees that Consultant <br /> is qualified to perform and fully capable of performing and providing the services required or <br /> necessary under this Agreement in a fully competent,professional and timely manner. <br /> 1.1.3 Time is of the essence with respect to this Agreement. <br /> 1.1.4 The services to be performed under this Agreement consist of Basic Services, as <br /> described and designated in Article 3 hereof. Compensation to the Consultant for Basic Services <br /> under this Agreement shall be as set forth herein. <br /> ARTICLE 2 RESPONSIBILITIES OF THE CONSULTANT <br /> Revised 12/18 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.