Browse
Search
2019-098-E AMS - Sasser Court Street Annex door
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-098-E AMS - Sasser Court Street Annex door
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 11:23:56 AM
Creation date
2/22/2019 10:15:43 AM
Metadata
Fields
Template:
Contract
Date
2/17/2019
Contract Starting Date
2/18/2019
Contract Ending Date
3/1/2019
Contract Document Type
Contract
Amount
$3,907.00
Document Relationships
R 2019-098 AMS - Sasser Court Street Annex door
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page | 2 <br /> <br />Orange County Annex Building <br />109 Court St <br />Hillsborough, NC 27278 <br />January 10, 2019 <br /> <br /> <br />GENERAL CONDITIONS <br />x Site supervision <br />x Project management <br />x Debris removal <br />x Daily clean up <br />x Final clean <br />DOORS, FRAMES, & HARDWARE <br />x Provide labor and materials to remove one (1) 6’-0” storefront system including <br />one (1) 3’-0” door <br />x Provide labor and materials to re-set the existing 6’-0” store front system including <br />one (1) 3’-0” storefront door. The new location for the storefront system is in the <br />same hall way. <br />WALLS & CEILINGS <br />x Provide labor and materials to point up drywall as required where the storefront <br />system was removed. Drywall to be sanded ready for paint. <br />x Provide labor and materials to clean acoustical ceiling as required in the location <br />where the storefront system has been removed <br />FLOORING <br />x Provide labor and materials to remove existing carpet at the new location for the <br />storefront door. Per the site meeting with Paul Sorrell we will remove only the <br />carper where the storefront frame will be located. <br />x Provide labor and materials to patch in the carpet at the existing storefront <br />location. Per the site meeting with Paul Sorrell we will use the carpet removed <br />from the new storefront location to make the carpet patch <br />PAINT <br />x Provide labor and materials to paint existing drywall in the hallway at the existing <br />location of the storefront system. Paint will be from casing to casing only not the <br />complete hallway as per the site meeting with Paul Sorrell. <br /> <br /> <br /> <br /> <br />DocuSign Envelope ID: E7294DB1-99CA-4134-94B4-C2E13EE21540
The URL can be used to link to this page
Your browser does not support the video tag.