Browse
Search
2019-092-E AMS - Motorola outdoor antenna
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-092-E AMS - Motorola outdoor antenna
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 10:42:46 AM
Creation date
2/22/2019 10:03:27 AM
Metadata
Fields
Template:
Contract
Date
2/15/2019
Contract Starting Date
2/15/2019
Contract Ending Date
7/15/2019
Contract Document Type
Agreement - Services
Amount
$24,137.00
Document Relationships
R 2019-092 AMS - Motorola outdoor antenna
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:283A3B52-C94B-489E-9B1D-4FD2FEF5E4AB <br /> MOrOROLA SOLUTIONS <br /> Orange County Wall mounted antenna system <br /> Removal and Re-Installation <br /> Statement of Work <br /> 1/22/19 <br /> Overview <br /> This document describes the statement of work (SOW) provided by <br /> Motorola to disconnect the existing antenna system from the Orange <br /> County, NC ("Orange County") Primary Communications Center and re- <br /> install this equipment following the Orange County remediation process. <br /> This document and other supporting information are provided to Orange <br /> County for the stated improvements. <br /> Relocation and installation services will be supplied for the following <br /> subsystems: <br /> • Wall mounted antenna system (5 yagi and 4 stick antenna) <br /> The following sections provide general descriptions of the implementation <br /> details provided under this contract. <br /> Antenna System <br /> A man lift will be rented to get up to the antennas on the wall. Antennas, <br /> pipes, coax, wall and mounted brackets will be removed. Before the <br /> Orange County contractor comes in for the sanitization. <br /> Antenna System Re-Installation <br /> Upon notice from Orange County that the Primary PSAP remediation <br /> process and remodeling has been completed Motorola/MCA will provide <br /> the following installation services. <br /> Wall mounted antenna system <br /> A man lift will be rented again the wall mounted brackets will be install <br /> with the pipes. The antenna will be put on the pipes, coax will be run <br /> from the antenna into the building to the poly phasers. All equipment <br /> will be grounded to the Motorola R56 standard. Wall mounted bracket <br /> will be reused and the antennas. Coax will be replaced as because it <br /> went into the building. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.