Browse
Search
2019-089-E AMS - Sasser Companies Air Scrubbers containment test
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-089-E AMS - Sasser Companies Air Scrubbers containment test
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 10:36:12 AM
Creation date
2/22/2019 10:03:02 AM
Metadata
Fields
Template:
Contract
Date
2/18/2019
Contract Starting Date
2/18/2019
Contract Ending Date
3/1/2019
Contract Document Type
Agreement - Construction
Amount
$98,360.00
Document Relationships
R 2019-089 AMS - Sasser Companies Air Scrubbers containment test
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 15540DF7-lAB4-4222-89C8-2164ECA8D311 <br /> 5 Sasser Companies <br /> PO Box 10 <br /> Whitsett NC 27377 <br /> OC_911CALLCENTER <br /> OC_911CALLCENTER <br /> DESCRIPTION QTY REMOVE REPLACE TAX O&P TOTAL <br /> 1. Commercial Supervision/Project 42.00 HR 0.00 56.55 0.00 475.02 2,850.12 <br /> Management-per hour <br /> 16.5 hours for Kevin Sasser,and 25.5 hours for Shawn Cassell from the start of the project through 11/30/18 <br /> 2. Cleaning&Remediation- 8.00 HR 0.00 45.32 0.00 72.52 435.08 <br /> Supervisory-per hr <br /> 8 hours for Rob Bryant from the start of the job through 11/30/18 <br /> Total: OC 911CALLCENTER 0.00 547.54 3,285.20 <br /> Main Level <br /> Main Level <br /> DESCRIPTION QTY REMOVE REPLACE TAX O&P TOTAL <br /> 3. Water Extraction&Remediation 35.50 HR 0.00 43.37 0.00 307.92 1,847.56 <br /> Technician-per hour <br /> 3 guys for 35.5 hours total <br /> 4. Neg.air fan/Air scrub.-XLrg(per 24 240.00 DA 0.00 50.00 0.00 0.00 12,000.00 <br /> hr period)-No monit. <br /> 8 large air scrubbers-4 in the Briefing Room to handle the air in the Call Center,and 4 to treat the air in the entrances-30 days <br /> 5. Add for HEPA filter(for neg.air 9.00 EA 0.00 242.62 155.25 467.78 2,806.61 <br /> machine/vacuum-Large) <br /> 6. Hazardous Material Remediation 1.00 EA 0.00 2,800.00 0.00 560.00 3,360.00 <br /> (Bid Item) <br /> Subcontract labor to make and install the duct work to condition the air in the Call Center <br /> 7. Containment Barrier/Airlock/Decon. 910.00 SF 0.00 0.83 4.78 152.02 912.10 <br /> Chamber <br /> 8. Peel&seal zipper-heavy duty 5.00 EA 0.00 14.67 4.08 15.50 92.93 <br /> STAIRWELL <br /> 9. Water Extraction&Remediation 6.00 HR 0.00 43.37 0.00 52.04 312.26 <br /> Technician-per hour <br /> 3 guys to air wash the back stairwell and add 1 air scrubber to the upper landing <br /> 10. Neg.air fan/Air scrub.-XLrg(per 16.00 DA 0.00 140.00 0.00 448.00 2,688.00 <br /> 24 hr period)-No monit. <br /> 1 air scrubber was added to the rear stair well <br /> EXTENDED PERIOD 12/13/18 TO 3/1/19 <br /> 11. Water Extraction&Remediation 16.00 HR 0.00 43.37 0.00 138.78 832.70 <br /> Technician-per hour <br /> 2 men 2 hours each to maintain containment and check equipment12/11/18. 2 men 2 hours each once per month to maintain containment,check <br /> equipment and change pre filters. 12/31/18, 1/31/19,&2/28/19 <br /> 12. Neg.air fan/Air scrub.-XLrg(per 1,014.00 DA 0.00 50.00 0.00 0.00 50,700.00 <br /> 24 hr period)-No monit. <br /> 13 air scrubbers for 78 days each based on discussions between Orange County and Kevin Sasser <br /> OC_91ICALLCENTER 12/16/2018 Page: 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.