Orange County NC Website
17 <br /> Background —2017 Transportation Study (map) <br /> Background —2017 Transportation Study (map) <br /> Background —2017 Transportation Study (map) <br /> Background — Process & Public Involvement <br /> Background — Public Questions & Comments <br /> Questions <br /> • What the plan is and is not <br /> • Will existing roads be improved? <br /> • Will government take property for the roads? <br /> • When will the development occur or the future roads? <br /> • What about multimodal, bike, ped, transit, etc.? <br /> • No four way stops, roundabouts! <br /> Responses <br /> • Existing road will not be removed <br /> • No, government is not taking or buying land <br /> • This is a vision, plan has no horizon year <br /> • Cross sections takes multimodal into consideration <br /> Background — Process & Public Involvement <br /> The Plan — Outline <br /> 1. Introduction <br /> a) State and Local Regulations; b) Background and Planning Area; c) Goals and <br /> Objectives; and d) Planned Projects <br /> 2. Access Management Plan <br /> a) Community Meeting; b) 2017 Transportation Study; c) Recommendations - <br /> Future Roadway Network, Cross-Section and Intersection Improvements; and d) <br /> AMP Update and Implementation <br /> 3. Implementation <br /> a) Roles and Responsibilities; b) Amendments; and c) Resources <br /> 4. Appendix <br /> a. 2011 E-B-M EDD AMP; b) 2017 E-B-M Transportation Study; and <br /> b. Community meeting <br /> The Plan — 2019 Draft E-B-M AMP (map) <br /> The Plan — Reduced Connectivity Option (map) <br /> The Plan — Includes Road Cross-Section Recommendations <br /> The Plan — Includes Road Cross-Section Recommendations <br /> The Plan — Includes Road Cross-Section Recommendations <br /> The Plan — Includes Road Cross-Section Recommendations <br />