Browse
Search
OUTBoard agenda 022019
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2019
>
OUTBoard agenda 022019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:51:05 AM
Creation date
2/15/2019 3:28:06 PM
Metadata
Fields
Template:
BOCC
Date
2/20/2019
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item 7.c. <br /> NCDOT DIV 7 PROJECTS LOCATED IN TARPO-UNDER DEVELOPMENT 39 <br /> TIP/WBS# Description Let/Start Date Completion Cost Status Project Lead <br /> Date <br /> SS4907BV Intersection improvements on NC 86 at SR 1545(Sawmill 4/9/18 Fall 2018 $104,000 Construction completed 11/8/2018, Dawn McPherson <br /> 47121.1.1 Road)/SR 1352(Carr Store Road).Improvements include Pending RTE Final Inspection <br /> 47121.2.1 flasher and"Vehicle Entering When Flashing"sign installation, <br /> 47121.3.1 channelization,and sight distance improvements. <br /> SS4907CD Horizontal curve improvements on SR 1710(Old NC 10)west 12/5/19 Spring 2020 $261,000 Planning and design activities Chad Reimakoski <br /> 47936.1.1 of SR 1561/SR 1709(Lawrence Road)east of Hillsborough. underway <br /> 47936.2.1 Improvements consist of wedging pavement and grading <br /> 47936.3.1 shoulders. <br /> R-5821A Construct operational improvements including 6/21/22 FY2024 $3,924,000 Planning and design activities Jennifer Evans <br /> 47093.1.2 Bicycle/Pedestrian accommodations on NC 54 from SR 1006 underway,coordinating with NC54 <br /> 47093.2.2 (Orange Grove Road)to SR 1107/SR 1937(Old Fayetteville West Corridor Study <br /> 47093.3.2 Road). <br /> 1-5958 Pavement rehabilitation on 1-40/1-85 from west of SR 1114 11/15/22 FY2024 $7,455,000 Planning activities pending Chris Smitherman <br /> 45910.1.1 (Buckhorn Road)to west of SR 1006(Orange Grove Road). <br /> 45910.3.1 <br /> 1-5959 Pavement rehabilitation on 1-85 from west of SR 1006(Orange 11/21/23 FY2025 $11,155,000 Planning activities pending Chris Smitherman <br /> 45911.1.1 Grove Road)to Durham County line. <br /> 45911.3.1 <br /> U-6071 Intersection improvements at NC 54 and SR 1007(Old 1/15/2026 FY 2027 $1,216,000 Planning and design activities Jennifer Evans <br /> 47496.1.1 Fayetteville Rd)in Carrboro underway,Project on hold due to Draft <br /> 47496.2.1 2020-2029 STIP <br /> 47496.3.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.