Orange County NC Website
Orange County & NCDOT Highway Luncheon 37 <br /> Division 7 and District 1 <br /> January 9, 2019 12:00 p.m. <br /> Renee Price asked about the impact on Tuscarora, which is a part of the Orange <br /> Grove Road Extension project area. Margaret Hauth replied that different alignment <br /> options are still being considered, but that there will be some changes. Some options <br /> have been discounted also. The Town didn't like the three options it reviewed <br /> previously. <br /> Craig Benedict initiated a discussion on the coordination of the Orange Grove Road <br /> and S. Churton Street projects under one NCDOT manager, and the coordination of <br /> the 1-85 and 1-40 projects that is necessary. <br /> Margaret Hauth stated that the 1-85/Churton Road interchange has to go first. <br /> Nish Trivedi said that the 1-85 interchange is part of the larger 1-85 widening and all of <br /> the projects are being scheduled around the same time. <br /> Margaret Hauth said that we need to get the project schedules correctly coordinated, <br /> timed out to be in the right order. NCDOT needs to involve the local staff in this <br /> coordination effort. Also, she wanted local staff to be able to see project information <br /> 7-10 days prior to public meetings so that they can properly prepare. Chuck Edwards <br /> said that NCDOT is definitely interested in staying connected with the Town and <br /> County on its projects. <br /> Penny Rich stated that the Town and County could see what NCDOT is doing first, <br /> and then put the information on local websites, perhaps utilizing links. Margaret said <br /> that those web sites will need to be built in the very near future. Penny Rich stated <br /> that it was most important to have NCDOT or Orange County telling the story. <br /> Pat Wilson stated that the new STIP is being released and a drop-in public session <br /> will be scheduled in Greensboro to collect comments. It will also be reviewed through <br /> the MPOs. He said that there is typically a two-week time period for information to be <br /> provided to local officials prior to public meetings. <br /> IV. NCDOT UPDATES ON PENDING OR ACTIVE PROJECTS <br /> A. TIP projects (NCDOT) <br /> Chuck Edwards reviewed the list of projects. (Exhibit IV.A.) <br /> B. Resurfacing and/or Bridge Replacements (NCDOT) <br /> (In addition to the typical update on projects, a brief overview of the various types of <br /> materials used for resurfacing and how that determination is made based on roadway <br /> type or function is requested. Also, County staff received an inquiry about wet- <br /> weather surface glare and the visibility of striping on Old NC 86 since its repaving.) <br /> Chuck Edwards reviewed the large number of completed bridge projects in the <br /> County and said that there will be no new bridge replacement projects in the next <br /> year. (Also in Exhibit IV.A.) <br />