Orange County NC Website
NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT 34 <br /> TIP/WBS# Description Let/Start CompletionDate Date Cost Status Project Lead <br /> SS-4907CD Horizontal curve improvements on SR 1710 (Old NC 10) 12/5/2019 Spring 2020 $261,000 Planning and design activities Chad Reimakoski <br /> 47936.1.1 west of SR 1561/SR 1709(Lawrence Road)east of underway <br /> 47936.2.1 Hillsborough. Improvements consist of wedging pavement <br /> 47936.3.1 and grading shoulders. <br /> 1-3306A Wideing 1-40 from 1-85 in Orange Co.to Durham Co. line(US TBD TBD $98,800,000 Planning and design activities Laura Sutton <br /> 34178.1.3 15/501 Interchange) underway, No schedule at this time <br /> 34718.2.2 other than CE doucment scheduled <br /> 34178.3.3 for 12/28/2018 <br /> P-5701 Construct Platform, Passenger Rail Station Building at 6/30/2021 FY2022 $7,200,000 PE funding scheduled 7/1/2020, Matthew Simmons <br /> 46395.1.1 Milepost 41.7 Norfolk Southern H-line in Hillsborough Coordinate with U-5848 <br /> 46395.3.1 <br /> R-5821A Construct operational improvements including 6/21/2022 FY2024 $3,924,000 Planning and design activities Jennifer Evans <br /> 47093.1.2 Bicycle/Pedestrian accommodations on NC 54 from SR 1006 underway, coordinating with NC54 <br /> 47093.2.2 (Orange Grove Road)to SR 1107/SR 1937(Old Fayetteville West Corridor Study <br /> 47093.3.2 Road). <br /> U-5848 Extend SR 1006(Orange Grove Road)on new location with 3/21/2023 FY 2025 $5,326,000 Planning and Design activities Laura Sutton <br /> 50237.1.1 Sidewalks and bike lanes from existing SR 1006 (Orange underway, Coordinate with P-5701 <br /> 50237.2.1 Grove Road)to US 70 Business in Hillsborough. and U-5845 <br /> 50237.3.1 <br /> 1-3306AC Interchange improvements at 1-40 and NC86 in Chapel Hill 3/21/2023 FY 2025 $16,500,000 Planning and Design activities Laura Sutton <br /> 34178.1.6 underway <br /> 34178.2.5 <br /> 434178.3.9 <br /> 1-5959 Pavement Rehabilitation on 1-85 from West of SR 1006 11/21/2023 FY 2025 $11,155,000 Funding approved 10/10/17 Chris Smitherman <br /> 45911.1.1 (Orange Grove Road)to Durham County line <br /> 45911.3.1 <br /> 1-5967 Interchange improvements at 1-85 and SR 1009(South 1/16/2024 FY 2027 $20,700,000 Planning and Design activities Laura Sutton <br /> 45917.1.1 Churton Street)in Hillsborough underway <br /> 45917.2.1 <br /> 45917.3.1 <br />