Browse
Search
OUTBoard agenda 011619
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2019
>
OUTBoard agenda 011619
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:48:51 AM
Creation date
2/15/2019 3:27:34 PM
Metadata
Fields
Template:
BOCC
Date
1/16/2019
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18 <br /> Attachment 2: Draft Durham-Chapel Hill-Carrboro(DCHC)MPO Project List <br /> Staff OUTBoard <br /> Description:Improve Homestead Road(SR 1777)from Old NC 86(SR 1009)to NC 86 to include bicycle lanes and sidewalks <br /> in sections of the corridor where they do not exist. Not carried <br /> Homestead Road forward by MPO <br /> Need:There are three(3)schools in the vicinity of Homestead Road:Chapel Hill High School,Smith Middle School,and <br /> 19 DCHC Bike Lanes and Seawell Elementary School.Many students live within walking and biking distance of Chapel Hill High School and must walk N/A No 20%local Removal* <br /> Sidewalks or cycle along or across Homestead Road on a daily basis.Provision of bikeway and pedestrian facilities is necessary to give match or local <br /> students a comfortable and safe place to travel separate from that of motorized vehicular traffic.Homestead Road is also a administration <br /> commuting route for adult utilitarian bicyclists connecting residential areas to other arteries serving employment centers <br /> Not carried <br /> Description:Construct bicycle lanes on Eubanks Road(SR 1727)from Old NC 86(SR 1009)to NC 86. forward by MPO <br /> 20 DCHC Eubanks Road Bike N/A Removal* <br /> Lanes Need:This project would provide a separate facility for both recreational and commuter bicyclists to reduce/eliminate the No 20%local <br /> bike/automobile modal conflict along this corridor.The project would also provide access to the Morris Grove Elementary match or local <br /> School on Eubanks Road. administration <br /> Description:Construct bike lanes and sidewalks from US 15-501 to Bennett Road and bike lanes from Bennett Road to the <br /> Chatham County line. Not carried <br /> Mt.Carmel Church forward by MPO <br /> 22 DCHC Road Need:This project would provide a continuous paved bikeway facility from Chapel Hill through southeastern Orange County N/A Removal* <br /> Bike/Pedestrian into Chatham County.The project connects to another project submitted by Chatham County to construct bike lanes along No 20%local <br /> Improvements Mt.Carmel Church Road from the Orange County line to Old Farrington Point Road.This segment is listed as a Statewide match or local <br /> bicycle facility in the DCHC MPO MTP and is a continuation of the state's Mountain to Sea bicycle route through Orange administration. <br /> County. <br /> Description:Construct a sidewalk along the west side of Orange High School Road from Harold Latta Road to U.S.70, <br /> construct a sidewalk along the south side of Harold Latta Road from Cloverfield Drive to Orange Grove Road,install high <br /> Orange High visibility crosswalks and in-road signage at school entrances and exits on Orange Grove Road,and construct a sidewalk Not carried <br /> School along entrance roads to CW Stanford Middle School. forward by MPO <br /> 2 DCHC Road/Harold Latta N/A Removal* <br /> Need:Orange High School Road serves two schools north of U.S.70,Orange High School and CW Stanford Middle School. No 20%local (See#9) <br /> Road Sidewalk <br /> There are currently no dedicated pedestrian facilities along Orange High School Road to accommodate students accessing match or local <br /> Improvements the schools from residential areas to the north and east.The project would provide safe and comfortable pedestrian administration. <br /> connections from these areas to the schools.The Orange County Safe Routes to School Action Plan identifies these sidewalk <br /> and crosswalk improvements as central elements in the plan for both Orange High School and CW Stanford Middle School. <br /> Description:Construct a pedestrian bridge over 1-40 alongside Orange Grove Road(SR 1006),construct a sidewalk along the <br /> north side of Orange Grove Road(SR 1006)from the pedestrian bridge to Timbers Drive,construct sidewalks along both <br /> sides of New Grady Brown School Road with a midblock crossing,and construct a sidewalk along one side of Oakdale Drive carried <br /> from Cheshire Drive to Orange Grove Road. forward Not carr <br /> rr ed <br /> Orange Grove <br /> MPO <br /> 24 DCHC Road/1-40 Need:1-40 separates two schools,Grady Brown Elementary and Cedar Ridge High School,from residential areas north of I- N/A No 20%local Removal* <br /> Pedestrian Bridge 40.The schools are within walking distance of residential areas,but bicyclists and pedestrians must share the roadway with match or local <br /> motor vehicles crossing the existing narrow two(2)-lane bridge that carries Orange Grove Road over 1-40.The bridge is too administration <br /> narrow to accommodate a pedestrian walkway.Lack of an adequate pedestrian crossing presents an unsafe environment for <br /> students to walk to the schools.The Orange County Safe Routes to School Action Plan identifies the pedestrian bridge and <br /> supporting sidewalk improvements as central elements in the plan for Grady Brown Elementary School. <br /> Description:Construct a pedestrian bridge across 1-85 to connect southern Hillsborough neighborhoods with Collins Ridge, <br /> Daniel Boone Village,and Downtown Hillsborough. Not carried <br /> forward by MPO <br /> 25 DCHC 1-85 Pedestrian Need:Neighborhoods to the south of 1-85,such as those along Cates Creek Parkway and Beckett's Ridge Drive,lack N/A Removal* <br /> Bridge pedestrian and bicycle connections to commercial amenities and neighborhoods north of the highway.Constructing a bridge No 20%local <br /> across 1-85 would create a safe access point for pedestrians and bicyclists and link areas of Hillsborough south of 1-85 to match or local <br /> Downtown Hillsborough and commercial amenities along Churton Street.Receiving sidewalks will be present on both sides of administration <br /> the proposed pedestrian bridge. <br /> Dairyland Road Description:Widen Dairyland Road(SR 1004/1113/1177)from Union Grove Church Road(SR 1111)to Orange Grove Road Not carried Removal* <br /> 26 DCHC Paved Shoulders (SR 1006)to include four(4)-foot paved shoulders. N/A forward by MPO (See val <br />
The URL can be used to link to this page
Your browser does not support the video tag.