Orange County NC Website
12 <br /> Attachment 1:Draft Triangle Area Rural Planning Organization(TARPO)Project List <br /> Recommendations <br /> MPO/ AADT 2010- Crashes 2006- <br /> Map RPO Project Description/Need 2016 2016 2018 Results <br /> Staff OUTBoard <br /> Description:Modernize Mebane Oaks Road(SR 1007)from NC 54 to 1-85 with NCDOT standard street cross- <br /> section 2E(60'row,1 T travel lane,5'bike lane,c&g,and sidewalk),add turn lanes and safety improvements at <br /> Old Hillsborough Road Road(SR-2126),Hebron Church Road(SR-1139),Yarborough Road(SR-1138),Oak north 4400-3400 Total 161 <br /> Grove Church Road(SR-1117),Jones Road(SR-1123),S Jim Minor Road(SR-2135),Nicks Road(SR-1119), 2 fatal New Project <br /> Mebane Oaks Road(SR- Bradshaw Quarry Road(SR-1100),and NC-54 4 serious injury <br /> 7 TARPO 1007)Improvement 19 minor injury N/A Meets RPO <br /> Need:This project would provide multimodal and safety improvements along a north-south corridor that 31 possible injury SPOT process <br /> connects Orange and Alamance County.This corridor is growing more unsafe with increasing accidents,two of 105 property <br /> south 2400-2400 damage <br /> them being fatal.Intersection improvements such as crosswalks and turn lanes will reduce crash frequencies <br /> and better manage traffic at key locations along the corridor. <br /> Description:Modernize Old NC-86(SR-1009)from 1-40 to Eubanks Road(SR-1727)with NCDOT standard <br /> street cross-section 2E(60'row,11'travel lane,5'bike lane,c&g,and sidewalk),add turn lanes at Davis Road north 5500-6300 Total 208 <br /> (SR-1129),and New Hope Church Road(SR-1723) 3 fatal <br /> 01 TARPO Old NC-86(SR-1009) Need:This project would provide multimodal and safety improvements along a north-south corridor for <br /> 3 serious injury New Project <br /> 8 /DCHC Improvement** commuters travel between Hillsborough and Carrboro.This corridor is growing more unsafe with increasing 15 minor injury N/A Meets RPO <br /> accidents,three of them being fatal.Intersection improvements such as crosswalks and turn lanes will reduce 24 possible injury sou4500-5000 163 property SPOT process <br /> crash frequencies and better manage traffic at key locations along the corridor.Traffic along this corridor will damage <br /> continue increasing making the area more hazardous and will eventually exceed the capacity of the existing <br /> road. <br /> Description:NC-57 to Caswell County north 4700-5700 Total 609 <br /> 9 fatal <br /> Need:This project would provide multimodal and safety improvements along a north-south corridor for 6 serious injury New Project <br /> 9 TARPO NC-86 Improvement** commuters travel between Orange and Caswell County.This corridor is growing more unsafe with increasing 46 minor injury N/A <br /> accidents,nine of them being fatal.Intersection improvements such as crosswalks and turn lanes will reduce south 11000- 111 possible Meets RPO <br /> crash frequencies and better manage traffic at key locations along the corridor.Traffic along this corridor will 11000 injury SPOT process <br /> continue increasing making the area more hazardous and will eventually exceed the capacity of the existing 437 property <br /> road. damage <br /> Description:Widen NC-54 from Orange Grove Rd(SR 1006)to Butler Rd(SR 1951)/Dodsons Cross Rd(SR East 12000- Total 340 New Project <br /> 1102)and from Butler Rd(SR 1951)/Dodsons Cross Rd(SR 1102)to Old Fayetteville Road(SR-1107)/ 15000 3 fatal <br /> Inside DCHC Meets RPO <br /> 8 serious injury 61.80 Region <br /> TARPO SPOT process <br /> 1 /DCHC NC-54 Improvement** Need:NCDOT projections reveal that traffic on NC 54 from Orange Grove Road to Old Fayetteville Road will 35 minor injury <br /> substantially exceed the existing roadway capacity by 2035,warranting an increase in capacity through West 9300- 61 possible injury 26.58 Division Fundable <br /> widening.NC-54 West Corridor Stud provides such recommendations necessary to address increasingtraffic 10000 233 property <br /> y p ry damage through <br /> and crashes along corridor. g Regional Impact <br /> Description:Widen from Mebane Oaks Road(SR-1007)to Orange Grove Rd(SR 1006). East 93000- New Project <br /> 10000 Total163 <br /> 1 fatal Meets RPO <br /> 4 serious injury <br /> Need:NCDOT projections reveal that traffic on NC 54 from Orange Grove Road to Old Fayetteville Road will SPOT process <br /> 11 TARPO NC-54 Improvement** 19 minor injury N/A <br /> substantially exceed the existing roadway capacity by 2035,warranting an increase in capacity through West 5800-6000 20 possible injury <br /> widening.NC-54 West Corridor Study provides such recommendations necessary to address increasing traffic 119 property Fundable <br /> and crashes along corridor damage through <br /> Regional Impact <br /> Notes: <br /> *STI Law§136-189.11.Transportation Investment Strategy Formula section(d).(3).c.—The Department shall not provide financial support for independent bicycle and pedestrian improvement projects. <br /> **Sidewalk subject to NCDOT sidewalk cost share policy 40%Orange County <br />