Orange County NC Website
Article 5: Uses <br /> Section 5.6: Standards for Commercial Service Uses <br /> <br /> <br /> <br />Orange County, North Carolina – Unified Development Ordinance Page 5-73 <br /> <br />(n) The minimum lot size for a Country Inn using a private well and septic <br />system shall be no less than ten acres. A Country Inn may be permitted <br />on lots of less than ten acres if the tract is currently served by public <br />water and sewer subject to the review and approval of the appropriate <br />agencies, and the Staff Engineer; or if the tract will receive public <br />services as part of a larger development project such as a planned <br />development or village flexible development. <br />(3) Expiration and Re-Approval of SUP <br />(a) The Class A Special Use Permit, if approved, shall be valid for six years, <br />but may be renewed or re-approved by the Board of County <br />Commissioners after receiving a report from the Planning Department <br />that the use is, and has been continuously since it was issued, in <br />compliance with provisions of the Special Use Permit. <br />(b) The Orange County Planning Department shall present its report on the <br />compliance of the special use no later than 90 days before the expiration <br />of the Special Use Permit. <br />(c) The Board of County Commissioners shall not renew the Special Use <br />Permit if it is determined that the applicant has failed to comply with the <br />conditions of approval. <br />(d) If the Board of County Commissioners does not renew the permit, the <br />permit shall become null and void upon the expiration of the time limit. <br />(e) If the Special Use Permit is not renewed or re-approved, then the <br />applicant may submit a new application as if it were a new use. <br />5.6.9 Microbrewery with Minor Events152 <br />(A) Standards for Class B Special Use Permit or ASE-CZ or MPD-CZ Zoning Districts <br />(1) In addition to the requirements in Section 2.7 or 2.9, as applicable, the following <br />information shall be submitted with the application materials: <br />(a) Description of special events to be held on-site, including frequency of <br />events, hours of operation, anticipated attendance, and any other <br />pertinent details. <br />(b) Location of overflow parking area(s) if required parking is not anticipated <br />to accommodate all special events. <br />(c) A map depicting surrounding uses and the distance to residential <br />structures. <br />(d) A description of retail sales and facility tours, if proposed. <br />(e) A comprehensive groundwater study, for facilities expected to use more <br />groundwater on an annual basis than an average single family residence <br />(which uses 240 gallons of water per day) built at the highest density the <br />existing zoning district would allow. For example, if the existing zoning <br />district allows a residential density of 1 unit for 2 acres and the proposed <br />use is on a six acre parcel (which could yield 3 residences), the <br />proposed use(s) may use three times the water used by an average <br />single family residence (or 720 gallons per day, on an annualized basis) <br />before a comprehensive groundwater study is required. The water usage <br />rates of any existing use subject to zoning regulations located on the <br />same lot shall be taken into account when determining if a <br />comprehensive groundwater study is required. Said study shall detail: <br />152MovedtothecentralMicrobreweryuseundertheManufacturing,Assembly,Processing,andDistributionUses <br />–FoodlandusecategoryinSection5.14.2oftherevisedUDO. <br /> 69