Browse
Search
ORC agenda 020619
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Ordinance Review Committee
>
Agendas
>
2019
>
ORC agenda 020619
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 3:19:48 PM
Creation date
2/15/2019 3:18:18 PM
Metadata
Fields
Template:
BOCC
Date
2/6/2019
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 5: Uses <br /> Section 5.6: Standards for Commercial Service Uses <br /> <br /> <br /> <br />Orange County, North Carolina – Unified Development Ordinance Page 5-66 <br /> <br />(D) Expiration and Re-approval of Special Use Permit151 <br />(1) The Class A Special Use Permit, if approved, shall be valid for six years, but may <br />be renewed or re-approved by the Board of County Commissioners after <br />receiving a report from the Planning Department that the use is, and has been <br />continuously since it was issued, in compliance with provisions of the Special <br />Use Permit. <br />(2) The Orange County Planning Department shall present its report on the <br />compliance of the special use no later than 90 days before the expiration of the <br />Special Use Permit. <br />(3) The Board of County Commissioners shall not renew the Special Use Permit if it <br />is determined that the applicant has failed to comply with the conditions of <br />approval. <br />(4) If the Board of County Commissioners does not renew the permit, the permit <br />shall become null and void upon the expiration of the time limit. <br />(5) If the Special Use Permit is not renewed or re-approved, then the applicant may <br />submit a new application as if it were a new use. <br />5.6.10 Short Term Rental – Non Host Occupied <br />(A) Use Standards <br />(1) Shall not be permitted as a Conditional Use District. Refer to Section 5.1.3 of <br />this Ordinance. <br />5.6.6 Rural Guest Establishment: Bed & Breakfast <br />(A) General Standards <br />(1) Submittal Requirements <br />(a) A site plan, prepared in accordance with the requirements of Section 2.5, <br />containing the following: (Per Section.2.5.2 professional design and <br />certification is not required for Rural Guest Establishments with three <br />guestrooms or less—bed & breakfasts.) <br />(i) Location, width, and type of all internal vehicular and pedestrian <br />circulation, and parking requirements. <br />(ii) Location and dimensions of all on site signage. <br />(iii) Boundaries of the site. <br />(iv) Location of well and septic system. <br />(b) Description of the proposed use(s) of the site and the buildings thereon, <br />including the following: <br />(i) Amount of area allocated to each use. <br />(ii) Number of full and part time employees. <br />(iii) Number of clients and/or occupants expected to use the facility. <br />(iv) Proposed hours of operation for non residential uses of the site <br />and within buildings thereon. <br />(c) Building plans for all existing or proposed structures to include floor <br />plans, elevations, and sections showing restoration/rehabilitation <br />proposed. <br />151ThisisexistinglanguageascontainedwithinSection5.6.7(A)(3)oftheUDO.Staffisstillreviewingifthepermit <br />canexpireonceissued. <br /> 62
The URL can be used to link to this page
Your browser does not support the video tag.