Orange County NC Website
<br /> <br /> <br />Conditions of Approval: <br /> <br />1. In accordance with the provision(s) of Section(s) 5.2.1 Table of Permitted Uses and <br />5.7.4 Camp/Retreat Center, activities allowed to occur on the property shall be in <br />accordance with the submitted application package, Site Plan and narrative as reviewed <br />by the Orange County Board of Adjustment on November 12, 2018. Furthermore, these <br />overall Site Plans shall be updated and included as part of the Site Plan submittals for <br />future Phases or groupings of buildings that are submitted for development permits. <br /> <br />2. To promote the public health, safety and general welfare as required in Section <br />5.3.2 (A) (2) (a), to ensure adjacent property values are maintained or enhanced as <br />required in Section 5.3.2 (A) (2) (b), and to ensure the proposed use is in harmony <br />with the general area as required in Section 5.3.2 (A) (2) (c) of the UDO all lighting <br />installed on the property shall comply with the provisions of Section 6.11 of the UDO. <br />Under no circumstances may lighting levels exceed 0.1 foot-candles at any property line. <br /> No new outdoor on-site lighting will be located within 100’ of the property boundaries. <br /> <br />3. To promote public safety as required in Section 5.3.2(B)(2) of the UDO, to ensure viable <br />vehicular access as required in Section 5.3.2 (B) (3), and in accordance with the <br />provisions of Section 2.5 of the UDO the applicant shall submit Site Plans and with <br />existing/projected vehicular trip generations to NC Department of Transportation <br />(NCDOT) prior to the commencement of earth disturbing activity. <br />4. To ensure general design standards as required in Section 5.3.3 of the <br />UDO, Orange County Erosion Control and Stormwater Permits shall be obtained by the <br />Camp with the initial site plan submittal. These permits shall include an overall land <br />disturbance plan that anticipates the camp’s anticipated total land disturbance at total <br />build-out. This plan shall be updated an included with subsequent site plan submittals. <br />RECOMMENDATION: <br /> <br /> <br />Staff has reviewed the application, the site plan, and all supporting documentation and has found that the <br />applicant complies with the application requirements, notice requirements, submittal requirements for <br />camp/retreat centers, specific standards of evaluation for Camp/Retreat centers, and required regulations as <br />outlined within the UDO <br /> <br />Staff has not received any evidence indicating the project does not comply with the UDO, including the provisions <br />of Section 5.3.2 (A) (2) inclusive, and establishing the grounds for making a negative finding on the general <br />standards as detailed herein. These standards include maintaining or promoting the public health, safety, and <br />general welfare, maintaining or enhancing the value of contiguous property, the use is in harmony with the area in <br />which it is to be located, and the use being in compliance with the general plan for the physical development of <br />the County. <br /> <br />The Board could make an affirmative finding on this application provided the Board of Adjustment finds in the <br />affirmative on the specific standards of evaluation and general standards as detailed herein, and no evidence is <br />entered into the record demonstrating the applicant has either: <br />a. Failed to meet their burden of proof that the project complies with the specific development standards for a <br />telecommunication facility, or <br />b. Fails to comply with the general standards detailed within Section 5.3.2 (A) (2) of the UDO. <br />In the event that the Board makes an affirmative finding, and issues the permit , staff recommends the attachment <br />of the following conditions: <br />393393393