Browse
Search
BOA agenda 011419 - cancelled
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2019
>
BOA agenda 011419 - cancelled
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 3:05:55 PM
Creation date
2/15/2019 3:00:57 PM
Metadata
Fields
Template:
BOCC
Date
1/14/2019
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
409
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. To ensure general design standards as required in Section 5.3.3 of the <br />UDO, Orange County Erosion Control and Stormwater Permits shall be obtained by the <br />Camp with the initial site plan submittal. These permits shall include an overall land <br />disturbance plan that anticipates the camp’s anticipated total land disturbance at total <br />build-out. This plan shall be updated an included with subsequent site plan submittals. <br />5. To promote the public health, safety and general welfare as required in Section <br />5.3.2 (A) (2) (a), to ensure adjacent property values are maintained or enhanced as <br />required in Section 5.3.2 (A) (2) (b), and to ensure the proposed use is in harmony <br />with the general area as required in Section 5.3.2 (A) (2) (c) of the UDO, existing <br />vegetation within 100’ of the property boundary (excluding property frontages along public <br />rights-of-way ) will remain undisturbed. <br />6. To promote the public health, safety and general welfare as required in Section <br />5.3.2 (A) (2) (a), to ensure adjacent property values are maintained or enhanced as <br />required in Section 5.3.2 (A) (2) (b), and to ensure the proposed use is in harmony <br />with the general area as required in Section 5.3.2 (A) (2) (c) of the UDO, no amplified <br />sound will be permitted on-site between the hours of 12:00am – 7:00am. <br />7. To promote the public health, safety and general welfare as required in Section <br />5.3.2 (A) (2) (a), to ensure adjacent property values are maintained or enhanced as <br />required in Section 5.3.2 (A) (2) (b), a n d permitted by Orange County Environmental <br />Health, the existing audible Low Pressure alarm associated with the septic system will be <br />replaced with a SMS/MMS notification system. <br />8. Per Section 2.5 of the UDO, the applicant shall obtain all necessary development <br />permits from the County prior to the initiation of and land disturbing activity <br />associated with the camp, but not limited to: <br />i. Building Permits; <br />ii. Environmental Health Permits; <br />iii. Erosion Control and Stormwater Management Permits; <br />iv. Solid Waste Management Permit; and <br />v. Zoning Compliance Permits. <br />STAFF COMMENT(S): <br />1. The applicant has offered the above conditions of approval for this request. These <br />conditions address potential impact (namely light, tree preservation and outdoor noise) on <br />adjacent properties. <br />2. Attachment 4 contains Staff’s evaluation of the proposals compliance with the various <br />standards detailed within these sections. <br />While no major concerns have been expressed, staff is recommending the imposition <br />specific conditions of approval offered by the applicant to ensure the project’s compliance <br />with the provisions of the UDO in the event the Board determines the application can be <br />approved. <br />3. As detailed within Attachment 5 staff has determined the application is consistent with <br />established submittal requirements and there is sufficient documentation demonstrating <br />compliance with established development standards. <br />313131
The URL can be used to link to this page
Your browser does not support the video tag.