Orange County NC Website
30 <br /> Southern Orange County Government Services Campus <br /> SPECIAL USE PERMIT <br /> PAGE <br /> Stormwater Management <br /> 43. Stormwater Management Plan: That this project must comply with the Section 5.4 Stormwater Management of the Land <br /> Use Management Ordinance. <br /> 44. Jordan Stormwater Management for New Development: That if the total disturbed area exceeds 0.5 acres,this project <br /> must comply with Section 5.19 Jordan Watershed Stormwater Management for New Development of the Land Use <br /> Management Ordinance to provide the required reductions in nitrogen and phosphorus loads for new development and <br /> redevelopment projects.- <br /> 45. Erosion Control Inspections: That,in addition to the requirement during construction for inspection after every rainfall, <br /> the applicant shall inspect the erosion and sediment control devices and offsite roadways daily,make any necessary repairs <br /> or adjustments to the devices,remove deposition of wet or dry silt on adjacent roadways and maintain inspection logs <br /> documenting the daily inspections and any necessary repairs. <br /> 46. Phasing Plan: That prior to issuance of a Zoning Compliance Permit,the applicant shall obtain Town Manager approval <br /> of a Phasing Plan that provides details of which improvements are to be constructed during each phase.The phasing plan <br /> shall detail that public improvements and stormwater management structures will be completed in each phase prior to <br /> requesting a Certificate of Occupancy.Construction for any phase may not begin until all public improvements in previous <br /> phases are complete,with a note to this effect on the final plans and plats. <br /> 47. Jordan Surety: That if the total disturbed area exceeds 0.5 acres,prior to issuance of a Certificate of Occupancy,the owner <br /> shall post a maintenance bond or other surety instrument satisfactory to the Town Manager,in an amount equal to one <br /> hundred twenty-five(125)percent of the construction cost of each stormwater management facility to assure maintenance, <br /> repair,or reconstruction necessary for adequate performance of the stormwater management facility,or establish a <br /> stormwater maintenance(sinking fund)budget and escrow account in accordance with the requirements of Section 5.19 of <br /> the Land Use Management Ordinance. <br /> 48, Erosion Control Bond:That if one acre or more is uncovered by land-disturbing activities for this project,then a <br /> performance guarantee in accordance with Section 5-97.1 Bonds of the Town Code of Ordinances shall be required prior <br /> to final authorization to begin land-disturbing activities. <br /> 49. Stormwater Facilities.Easements,and Operations and Maintenance Plans:That all stormwater detention,treatment and <br /> conveyance facilities located on and below the ground shall be wholly contained within an casement entitled: "Reserved <br /> Stormwater Facility Easement Hereby Dedicated"and shall be reserved from any development which would obstruct or <br /> constrict the effective management,control,and conveyance of stormwater from or across the property,other than the <br /> approved design and operation functions.A copy of the final plat or easement exhibit,signed and sealed by a North <br /> Carolina-registered Land Surveyor and recorded by the County Register of Deeds,and containing the following notes shall <br /> be submitted prior to issuance of the Certificate of Occupancy. <br /> 1. A suitable maintenance access(minimum 20'wide)to accommodate heavy equipment from the nearest public <br /> right-of-way to the Reserved Stormwater Facility Easement must be provided and shown on the plans. <br /> 2. The"Reserved Stormwater Facility Easements"and the facilities it/they protect are considered to be private,with <br /> the sole responsibility of the owner to provide for all required maintenance and operations as approved by the <br /> Town. <br /> 3. The Reserved Stormwater Facility Easement and the Operations and Maintenance Plan are binding on the owner, <br /> heirs,successors,and assigns. <br /> 50. Stormwater Operations and Maintenance Plan Recordation:That prior to issuance of a Certificate of Occupancy,a <br /> Stormwater Operations and Maintenance Plan,signed by the owner and recorded at the County Register of Deeds,shall be <br /> provided for the proposed stormwater management facilities and submitted to the Stormwater Management Engineer for <br /> approval.A schedule of inspection and maintenance tasks shall be included.The operation and maintenance plan shall <br /> require the owner of structural BMP's to perform and maintain a record of annual inspections by a qualified professional. <br /> 51. Erosion Control:That during the construction phase,additional erosion and sediment controls may be required if the <br /> proposed measures do not contain the sediment.Sediment leaving the property is a violation of the Town's Erosion and <br /> Sediment Control Ordinance.The applicant shall inspect erosion and sediment control devices daily,make necessary <br /> adjustments to the devices and maintain inspection logs documenting inspections and repairs. <br /> i <br /> 52. Curb Inlets:That the applicant shall provide pre-cast curb inlet hoods and covers stating,"Dump No Wastel Drains to <br /> Jordan Lake",in accordance with the specifications of the Town Standard Detail SD-5A,for all new curb inlets for private, <br /> Town and State rights-of-way. <br /> 53. On-Site/Adiacent Stormwater Features:That prior to issuance of a Zoning Compliance Permit for new construction, <br /> existing site conditions and features shall be located on plans,including all on-site and adjacent stormwater drainage <br /> features.The final plans must provide proper inlet protection for the stormwater drainage inlets on or adjacent to the site to <br /> ensure the Stormwater drainage system will not be obstructed with construction debris. <br /> 54. P.E.Certification:That prior to the issuance of a Certificate of Occupancy for any phase,the applicant shall provide a <br /> certification,signed and sealed by a North Carolina-licensed Professional Engineer,that the stormwater management <br /> facilities are constructed in accordance with the approved plans and specifications. j <br />