Orange County NC Website
I Travis Myren said that would be a policy decision by the Board of County <br /> 2 Commissioners, and staff is not proposing this choice. He said the only way to realize the <br /> 3 savings is to reduce the personnel costs. <br /> 4 Commissioner McKee clarified that dropping the 40 beds would essentially put the jail at <br /> 5 its current population, and he wonders why the County would ever build a facility for the current <br /> 6 population. <br /> 7 Travis Myren said that is a judgment call, and today there are 81 inmates in the jail. He <br /> 8 said that number fluctuates and, of those 81 inmates, 82% are there on felony charges. He <br /> 9 said staff is working to get the pre-trial number as small as possible, but there is still a larger <br /> 10 group of inmates there on larger charges. <br /> 11 Commissioner Marcoplos reiterated why he supported the number of beds: he said the <br /> 12 last thing he would want is for the County to find itself over capacity 10, 20, 30 years down the <br /> 13 line. He reaffirmed his support for 144 beds. He referred to the sallyport, and said it is near <br /> 14 the entrance. He too voiced concern about the razor wire, but said it seems the razor wire may <br /> 15 not be necessary. He said he spoke with the Sheriff last week, who mentioned that the sallyport <br /> 16 is a fallback containment area in the case of an emergency evacuation of the building. He said <br /> 17 he wonders what impact it may have if this capability were not an option. <br /> 18 Commissioner Marcoplos asked if the area could be used for evacuation if there was a <br /> 19 fence with a roof over it. <br /> 20 Sheriff Blackwood thanked Travis Myren for the work he has done. He referred to the <br /> 21 difference of brick versus fence, and said the County made a promise to the community that <br /> 22 they would design this facility to look unlike a jail. He said it is important to keep this promise <br /> 23 when at all possible. He said the ability to pull into an enclosed brick structure to unload and <br /> 24 load inmates is critical, and is one that he can work around. He said he has a team of <br /> 25 committed staff that will make whatever work, wherever. <br /> 26 Sheriff Blackwood said ultimately this is a cost issue, and it is a decision to be made by <br /> 27 the BOCC. He said the BOCC will either be remembered for doing this really right, or really <br /> 28 wrong. He said he and Commissioner Price visited Buncombe County, which is a bigger <br /> 29 county. He said he does not necessarily want to be a big county, but does want to be a safe <br /> 30 county. He said he will support any type of fence structure, as long as it is done right. <br /> 31 Commissioner Marcoplos asked if landscaping could make the entrance more <br /> 32 aesthetically pleasing. <br /> 33 Blair Bordeaux said landscaping could hide it somewhat, but it will still look like a fence. <br /> 34 He said a fence is also somewhat of a security issue, as it maintains a line of sight, as opposed <br /> 35 to an enclosed structure. <br /> 36 Commissioner Dorosin said his position is to reduce the size the facility, and he sees no <br /> 37 reason to house federal inmates at all. He said the smaller facility is manageable and <br /> 38 reasonable. He said funds are being put into diversionary programming, and Orange County is <br /> 39 not growing that fast. He said given the savings that this change would produce, this is one of <br /> 40 the changes the Board should make. He said he would not support postponing the other <br /> 41 projects, especially the EAC. He said if these projects are postponed, he doubts they will ever <br /> 42 get built. He said if the philosophy is that these buildings can be done later, then he thinks the <br /> 43 same philosophy should apply if an expansion is needed on the jail at a later time. He said the <br /> 44 EAC is in poor shape, and putting money into it is a waste. He said the current EAC sits on the <br /> 45 most valuable piece of property that the County owns, and leaving it as the EAC is the lowest <br /> 46 and worst use of this land. <br /> 47 Commissioner Dorosin pushed option 3 with an inclusion of reducing the facility by 40 <br /> 48 beds. He said he would still support option 3 if the Board does not want to reduce beds. <br /> 49 Commissioner Bedford said she is concerned about the capital budget in general, but a <br /> 50 delay in the build will only cost more later, which is true with every project the Board must fund. <br />