Browse
Search
Agenda - 02-19-2019 8-a - Minutes
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2019
>
Agenda - 02-19-19 Regular Meeting
>
Agenda - 02-19-2019 8-a - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 4:56:33 PM
Creation date
2/14/2019 4:53:40 PM
Metadata
Fields
Template:
BOCC
Date
2/19/2019
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Agenda - 02-19-2019 Regular Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 02-19-19 Regular Meeting
Minutes 02-19-2019 Regular Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IMI <br /> Repurpose Funds Repurpose Repurpose Repurpose Funds <br /> Repurpose Funds from from Prior Jail Funds from Repurpose Funds from Funds from from Prior Jail <br /> Prior Jail Project Project Prior Jail Project Prior Jail Project Prior Jail Project <br /> Project <br /> Value Engineering Value Engineering Engineering Value Value Engineering Value Engineering Value Engineering <br /> Strategies Strategies Strategies Strategies Strategies Strategies <br /> Project Scope <br /> Project Scope Reductions <br /> Project Scope Project Scope Project Scope Reductions Add Back Add Back <br /> Reductions Reductions Reductions Sallyport - $200,000 Sallyport and <br /> Hearing Room <br /> - $328,000 <br /> Other CIP Deferments Other CIP Other CIP Other CIP Deferments Other CIP Other CIP <br /> Deferments Deferments Deferments Deferments <br /> Postpone EAC and Postpone EAC <br /> Parks Ops. Construction and Parks Ops. <br /> Construction <br /> Reduce Detention Center <br /> Capacity by 40 Beds <br /> 26,104,011 28,751, 031 36,502,406 $36,702,406 $36 830,406 36,940,406 <br /> 1 <br /> 2 Commissioner Price referred to option 2, and asked if includes the brick sallyport and <br /> 3 the hearing room. <br /> 4 Travis Myren said if those items are included, option 2 would increase by $328,000. <br /> 5 Commissioner McKee asked if the brick sallyport would have the razor wire around the <br /> 6 top. <br /> 7 Travis Myren said the concertina wire at the top could be omitted. <br /> 8 Commissioner McKee said it changes the appearance, and given the location, this is a <br /> 9 critical consideration. <br /> 10 Commissioner Dorosin said the presentation said reducing the number of beds would <br /> 11 reduce the federal revenue, and he thought that this revenue was a net loss for the County. <br /> 12 Travis Myren said on a per bed daily basis, the County receives $93, and it costs <br /> 13 approximately $110 per day to house the prisoner. He said the biggest cost of the per-bed day <br /> 14 is the staff supervision, and in order to realize the savings, which would be associated with not <br /> 15 housing the federal inmates, the County would have to reduce the number of full-time <br /> 16 employees supervising the inmates. <br /> 17 Travis Myren said there is some built in expansion capability at 144 beds, and if the local <br /> 18 population increases that this would crowd out the federal inmates. <br /> 19 Commissioner McKee said he wondered if reducing the bed capacity would result in <br /> 20 people losing jobs. He said he suspects the office needs more officers, not less. <br />
The URL can be used to link to this page
Your browser does not support the video tag.