I As currently designed, the new Detention Center would consist of one hundred forty-four (144) <br /> 2 beds in approximately 48,900 square feet. The new facility would replace the existing 40,227 <br /> 3 square foot detention facility located in downtown Hillsborough that was originally constructed in <br /> 4 1925 with additions and modifications occurring in the early 1980's and mid-1990's. The new <br /> 5 17,200 square foot Environment and Agricultural facility would replace the 19,087 square foot <br /> 6 office building currently located on Revere Road that houses the Department of Environment, <br /> 7 Agriculture, Parks and Recreation, Cooperative Extension, Farm Service Agency, and Soil and <br /> 8 Water Conservation. Finally, the 8,500 square foot Parks Operations Base would replace <br /> 9 scattered facilities at Millhouse Road Park used for office and equipment storage. <br /> 10 <br /> 11 The County has recently completed the schematic design phase of the project and updated <br /> 12 cost estimates based on the building dimensions described above and programming needs of <br /> 13 the future building occupants. Based on those estimates, the current authorized budget amount <br /> 14 is not sufficient to complete the entire scope of the project. <br /> 15 <br /> 16 With no changes to the current project scope or value engineering, the project is projected to <br /> 17 exceed the budgeted appropriation by approximately $13 million. Attachment 1 details the <br /> 18 schematic design cost estimates and budgeted appropriations for each element of the project. <br /> 19 <br /> 20 At least three factors have contributed to this difference. First, these projects have been <br /> 21 included in the Capital Investment Plan for several years without budget escalation to recognize <br /> 22 inflationary cost pressures. The Detention Center has been in the CIP since 2012. The <br /> 23 Environment and Agricultural Center was originally included in the CIP in 2014, and the Parks <br /> 24 Operations Base was included in 2013. In recent years, construction costs have escalated by <br /> 25 five to seven percent annually. Second, the current construction environment is highly <br /> 26 competitive, so an inflationary adjustment of seven percent (7%) is added to the projected <br /> 27 costs. Finally, the original budget did not assume site acquisition costs or the associated <br /> 28 increase in site preparation for a larger site compared to the original detention center site <br /> 29 owned by the State. Several strategies can be used to reduce the cost of the Northern Campus <br /> 30 Project. <br /> 31 <br /> 32 Repurpose Previously Appropriated Funds: The County had previously borrowed funds for <br /> 33 Detention Center Design. Of this amount, approximately $718,000 is remaining to apply to the <br /> 34 current Northern Campus Project. <br /> 35 <br /> 36 Value Engineering: Value engineering strategies can be used to change architectural and <br /> 37 aesthetic features without impacting how the facilities function. The project team has identified <br /> 38 $875,000 in value engineering strategies as detailed in Attachment 2. <br /> 39 <br /> 40 Project Scope Reductions: Elements of the project may be reduced or eliminated to produce <br /> 41 savings. The staff team has identified $438,000 in potential scope reductions as detailed in <br /> 42 Attachment 3. As part of the scope reduction exercise, the number of Detention Center beds <br /> 43 was examined. The Detention Center capacity could be reduced by forty (40) beds which would <br /> 44 eliminate any capacity to house federal inmates and would immediately fill the available beds. <br /> 45 The elimination of federal inmates would also reduce operating budget revenue by $1.6 million. <br /> 46 <br /> 47 Project Deferments: Projects that are currently programmed in the Capital Investment Plan <br /> 48 could be eliminated or deferred to a later date when the County's debt capacity would <br /> 49 accommodate them. The Southern Human Services expansion and a portion of the Cedar <br /> 50 Grove Park Phase 2 expansion could be postponed for a savings of $2.6 million. Components <br />