Browse
Search
Agenda - 02-19-2019 8-a - Minutes
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2019
>
Agenda - 02-19-19 Regular Meeting
>
Agenda - 02-19-2019 8-a - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 4:56:33 PM
Creation date
2/14/2019 4:53:40 PM
Metadata
Fields
Template:
BOCC
Date
2/19/2019
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Agenda - 02-19-2019 Regular Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 02-19-19 Regular Meeting
Minutes 02-19-2019 Regular Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I Burlington-Graham MPO: <br /> 2 <br /> 3 1) US-70 Improvements: Widen US-70 and improve intersections from Buckhorn Road <br /> 4 (SR-1114) to Durham County with NCDOT standard street cross-section 4G (110, row, <br /> 5 17.5' median, 11' travel lanes, 5' bike lane, c&g, and sidewalk), add turn lanes and <br /> 6 safety improvements at NC-86, St. Mary's Road (SR-1002), Efland Cedar Grove Road <br /> 7 (SR-1004), Frazier Road (SR-1310), Richmond Road (SR-1312), Brookhollow Road <br /> 8 (SR-1324), Faucette Mill Road (SR-1328), Miller Road (SR-1555), Lawrence Road (SR- <br /> 9 1561), Palmers Grove Church Road (SR-1562), Pleasant Green Road (SR-1567), <br /> 10 Orange High School Road (SR-1588), and N Scotswood Boulevard (SR-2300). <br /> 11 <br /> 12 2) Mattress Factory Road Interchange: Construct a new interchange at the existing grade- <br /> 13 separated crossing of Mattress Factory Road and 1-85/1-40. <br /> 14 <br /> 15 3) Mattress Factory Road Extension to U.S. 70: Extend Mattress Factory Road northward <br /> 16 across East Washington Street and the NCRR/Norfolk Southern railroad right-of-way to <br /> 17 intersect U.S. 70 and close the existing railroad crossover road connecting East <br /> 18 Washington Street and U.S. 70 approximately 240 feet to the east of the intersection of <br /> 19 Mattress Factory Road and East Washington Street. <br /> 20 <br /> 21 4) Buckhorn Road (SR 1114) Widening: Widen Buckhorn Road from U.S. 70 to West Ten <br /> 22 Road (SR1144) to multiple lanes with bicycle and pedestrian facilities with grade <br /> 23 separation connection at US-70. <br /> 24 <br /> 25 5) Lebanon Road Improvements: Intersection and safety improvements along Lebanon <br /> 26 Road (SR-1306) from Mill Creek Road (SR-1345) to Efland-Cedar Grove Road (SR- <br /> 27 1004). <br /> 28 <br /> 29 6) Mebane Oaks Road Improvements: Modernize Mebane Oaks Road (SR 1007) from NC <br /> 30 54 to 1-85 with NCDOT standard street cross-section 2B (60' row, 11' travel lanes, with <br /> 31 5' paved shoulder), add turn lanes and safety improvements at Old Hillsborough Road <br /> 32 Road (SR-2126), Hebron Church Road (SR-1139), Yarborough Road (SR-1138), Oak <br /> 33 Grove Church Road (SR-1117), Jones Road (SR-1123), S Jim Minor Road (SR-2135), <br /> 34 Nicks Road (SR-1119), Bradshaw Quarry Road (SR-1100), and NC-54. <br /> 35 <br /> 36 Triangle Area RPO: <br /> 37 <br /> 38 1) Old Greensboro Road Paved Shoulders: Modernize Old Greensboro Road (SR-1005) <br /> 39 from Jones Ferry Road (SR-1942) to Alamance County with NCDOT standard street <br /> 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.