Orange County NC Website
17 <br /> 1 A long-range vision for the area <br /> 2 Dedication of right-of-way through a development application <br /> 3 Ensure future development addresses transportation through approval process <br /> 4 <br /> 5 What the plan is not: <br /> 6 Funded new roads or improvements <br /> 7 Acquisition/purchase of right-of-way <br /> 8 Construction of future roads <br /> 9 Permanent/guarantees area develops <br /> 10 <br /> 11 Background — How the plan works (table) <br /> 12 <br /> 13 Background — Plan History (table) <br /> 14 <br /> 15 Background — Future Land Use Map (map) <br /> 16 <br /> 17 Background— 2011 Adopted E-B-M AMP (map) <br /> 18 <br /> 19 Background — 2017 Transportation Study (map) <br /> 20 <br /> 21 Background — 2017 Transportation Study (map) <br /> 22 <br /> 23 Background — 2017 Transportation Study (map) <br /> 24 <br /> 25 Background — Process & Public Involvement <br /> 26 <br /> 27 Background — Public Questions & Comments <br /> 28 Questions <br /> 29 • What the plan is and is not <br /> 30 • Will existing roads be improved? <br /> 31 • Will government take property for the roads? <br /> 32 • When will the development occur or the future roads? <br /> 33 • What about multimodal, bike, ped, transit, etc.? <br /> 34 • No four way stops, roundabouts! <br /> 35 <br /> 36 Responses <br /> 37 • Existing road will not be removed <br /> 38 • No, government is not taking or buying land <br /> 39 • This is a vision, plan has no horizon year <br /> 40 • Cross sections takes multimodal into consideration <br /> 41 <br /> 42 Background — Process & Public Involvement <br /> 43 <br /> 44 The Plan — Outline <br /> 45 1. Introduction <br /> 46 a) State and Local Regulations; b) Background and Planning Area; c) Goals and <br /> 47 Objectives; and d) Planned Projects <br /> 48 2. Access Management Plan <br />