Browse
Search
2019-072-E AMS - Siemens Justice Center humidity
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-072-E AMS - Siemens Justice Center humidity
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2019 11:40:45 AM
Creation date
2/13/2019 3:56:19 PM
Metadata
Fields
Template:
Contract
Date
2/4/2019
Contract Starting Date
2/11/2019
Contract Ending Date
6/11/2019
Contract Document Type
Agreement - Services
Amount
$26,835.00
Document Relationships
R 2019-072 AMS - Siemens Justice Center humidity
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:2CDD1A17-B035-4812-8F35-A9B16898AB3C <br /> DocuSign Envelope ID:12C2C73B-E5A5-42D3-861F-608EF32071C0 <br /> Customer Proposal <br /> Orange County No.: 546-N-3052 <br /> Attn: Eddie Hutter Date: January 7,2019 <br /> Expires: April 6,2019 <br /> Project: Orange County--Justice Humidity Control Project <br /> Price: $26,835 Twenty Six Thousand Eight Hundred Thirty Five Dollars <br /> Scope of Work <br /> o Siemens will provide the following for Heat Pump units HP16,HP17,and I P18: <br /> a) Provide and install three(3)18"x 18"electric duct heater in the HP supply duct(1 per HP). <br /> b) Provide power to the duct heaters from nearest available power panel, <br /> c) Provide and install three(3)duct humidity sensors in the HP return duct(I per FIP) <br /> d) Provide and install one(1)Siemens Bus Interface Module with TX UO for point pickup. <br /> e) Wire and terminate new control points: <br /> i, Return humidity sensor. <br /> ii. Duct heater control. <br /> f) Create and implement necessary programming and system alarms. <br /> g) Provide training on new controls strategy. <br /> h) Provide as-built drawings, <br /> Clarifications/Exclusions <br /> o All work conducted during regular hours,fiom 8am to 5pm Monday through Friday. <br /> o Project assumes the existing Heat Pump units are in proper working condition. <br /> o Assumes power requirements for the duct heaters is available in the same mechanical room. <br /> The Tens and Conditions of Sale shown on the attached are apart hereof <br /> Proposal Accepted: <br /> Proposal Submitted: <br /> Siemens Industry, Inc. Is authorized <br /> to proceed with the work as proposed. Siemens Industry, Inc. <br /> Purchaser Seller Siemens Industry,Inc. <br /> By By Jacob Snyder <br /> Title Title Account Executive <br /> Date Date January7,2019 <br /> Page] of 6 <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.