Browse
Search
Agenda - 11-16-2004-9b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 11-16-2004
>
Agenda - 11-16-2004-9b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:13:18 AM
Creation date
8/29/2008 10:26:13 AM
Metadata
Fields
Template:
BOCC
Date
11/16/2004
Document Type
Agenda
Agenda Item
9b
Document Relationships
Minutes - 20041116
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
101 Inm n mWn .L ~ nur <br />Suirt IOU <br />Vn~ri~rillr ~b'( _'%]GO <br />CABLE <br />May 17, 2004 <br />Mr, Tolm M. Linlc, Jr. <br />Orange County Manager <br />PO Box 8181 <br />Hillsborough, NC 27278 <br />SENT CERTIFIED-RETiIRN RECEIPT REQUESTED <br />Dear Mr. Linlc: <br />I am in receipt of your letter dated Apri130, 2004 regarding building Time Warner Cable <br />services to the Govenunent Services Center (GSC) on 200 Cameron Street in <br />Hillsborough. <br />Time Warner Cable's Commercial Services staff has diligently worked with Mr. Wilder <br />beginning on October 28, 2003 to determine serviceability of the building on 200 <br />Cameron Street. <br />The site survey conducted by Eric Vivod states the cost to bring cable to the building <br />would be $4,000. This is indicated in the attached site survey.. <br />Mr. Wilder was contacted by our Commercial Services staff by phone to relay the cost of <br />the construction. During this conversation, the decision whether or not to construct plant <br />to the facility was left to Mr. Wilder's discretion. This is normal operating procedure for <br />providing quotes in commercial services. <br />I also contacted Mr. Wilder about the cost associated with the construction to the building <br />and detailed the construction procedures that would need to be done to bring cable to the <br />facility. <br />Construction costs for this project include: redesign of our existing cable plant (bringing <br />cable from the utility pole across the street to the building across the street, via <br />underground boring), two sidewalk bores, trenching to the building (manual labor), and <br />core boring (drilling a hole in the building) for provision of service to the building. <br />i3 <br />If the County would like to proceed in building plant to the Govermnent Services Center, <br />please feel free to contact me at (919) 573-7111. <br />
The URL can be used to link to this page
Your browser does not support the video tag.