Orange County NC Website
16 <br />As indicated above, more than adequate sewer service can be provided to the park restroom/concession <br />facility via an 8" diameter gravity sewer line which, at minimum slopes (0.40% by regulation) and <br />flowing half frill, can accommodate a flow of approximately 225 gpm or 13,500 gallons per hour. In <br />general, the regulatory calculation for park visitors is 5 gallons per day per visitor. An 8' line could <br />accommodate approximately 2700 new visitors per hour. <br />I estimate that connecting the restroom /concession facility to the nearest existing OWASA sewer line <br />will require the construction of a sewer, extension of approximately 3400 feet (from existing sewer lines - <br />shown in green on the attached map - in the Lake Hogan Farm subdivision) up Jones Creek all the way <br />across the southern-most County owned parcel to at least the common east -west property line ( OWASA <br />generally requires that utility extension projects extend all the way across parcels so that the next parcel <br />owner can extend the utility in turn). An additional 600 feet of sewer line would be required to connect <br />the restroom /concession facility to the outfall. This service line could be as small as 6" line. The total <br />cost for the 8" and 6" line is estimated to fall in the $400,000 to $500,000 range. <br />The projected costs associated with activating a 2000 feet section of OWASA's existing 16" <br />transmission main along Old NC 86, and installing 2000 feet of 3" line into the park to the proposed <br />restroom/concession facility is estimated to be approximately $50,000 to $75,000 depending on the need <br />to install automatic flushing devices and /or onsite chlorination equipment to insure the availability of <br />high quality water at that facility under all park use /water demand conditions. Total pricing estimates for <br />larger sized water lines necessary to meet potable and fire flow water demands for schools sites have not <br />been provided because water quality concerns make it is impractical to provide the upsized lines prior to <br />the schools and /or other high demand uses being ready or nearly ready to come online. However, current <br />day prices for 10" to 12" water mains are expected to fall in the $50 to $75 per foot range. <br />At this time, it is not clear what the wastewater demands would be for the "water playground" shown to <br />be located north of the existing pond on the draft master plan. Extension of sewer service to serve this <br />area would probably require the extension of an additional 2500 feet of 8 "sewer line up Buckhorn <br />Branch at a cost in the range of $250,000 to $312,500. <br />Please note that these estimates are based in my review and understanding of the Twin Creeks draft <br />master plan dated September 2, 2004. Changes in location of proposed facilities having a water and <br />sewer utility demand; the addition of more facilities having a water and sewer demand; a decision to <br />utilize OWASA potable water supplies for irrigation; or decisions to upsize water and sewer lines to <br />accorn modate non -park water and sewer demands will have a profound effect on the projected costs <br />cited herein. Costs cited are in today's dollars. The cost of utility construction has increased <br />dramatically — far greater than inflation - related costs increases - in some instances of late. <br />If I may provide additional clarification on this matter, please advise <br />