Browse
Search
Agenda - 11-16-2004-5n
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 11-16-2004
>
Agenda - 11-16-2004-5n
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:18:06 AM
Creation date
8/29/2008 10:26:03 AM
Metadata
Fields
Template:
BOCC
Date
11/16/2004
Document Type
Agenda
Agenda Item
5n
Document Relationships
2004 S ERCD - Fairview Master Plan - Memorandum of Agreement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2004
Minutes - 20041116
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />Draft: 10/25/04 <br />A. CHARGE to the Master Plan Committee: <br />Develop a Master Plan for the Site, within the framework of any operating guidelines or <br />other instructions as offered by the elected Boards, to include the following: <br />1. A map of the Site with the design for the Fairview Parlc, including proposed <br />buildings, playing fields, roads, parking, trails, other facilities, amenities, <br />infrastructure locations, vegetative cover, hydrology and other components that <br />are commonly included in a park or public facility concept plan, The map of the <br />Site shall include existing and planned buildings of the County Parks Operations <br />Base and the Town and County Public Works facilities. Planning of the County <br />Parks Operations Base and the Town and County Public Works facilities is <br />limited to the location of buildings, roads, parking and other infrastructure. <br />2. A written report outlining the proposed uses, the design rationale, description of <br />work group process, natural and cultural features, means of soliciting community <br />input, the potential future phases, and construction cost estimates. If needed, the <br />report should also include a phasing plan, showing how the Fairview Park and <br />other public facilities could be developed over time in acost-efficient fashion., <br />The report should include a recommendation concerning which facilities should <br />be constructed, utilizing the funds remaining from the $850,000 allocated for the <br />project after the planning, design, and survey work (estimated to cost $200,000) <br />have been completed, <br />3. The report should address and recognize the limitations imposed by safety <br />considerations caused by the Fairview park site's previous use for' waste-disposal, <br />as addressed in pazt by a geo-technical report prepared in 1999 ("Report of <br />Geotechrrical Evaluation, Closed Hillsborough Landfill Site, July 19, 2000"). <br />Further recommendations may be needed to address phased remediation of <br />portions of the Fairview park site. <br />4,. The Master Plan should address co-location of existing and future public facilities <br />and provide for a synergy and compatibility of uses between park functions and <br />other public functions wherever possible. The rights of neighbors should he <br />respected by buffering incompatible uses. <br />5. The Committee should review the "old" 1988 Fairview Park Concept Plan as part <br />of the Master Plan and determine its validity, if any. <br />2. EXPECTATIONS OF MASTER PLAN FINAL PRODUCT /MEMBERSHIP OF <br />MASTER PLAN COMMITTEE <br />Product: A Master Plan report and map, as described above,. <br />Timeframe for Product: by Septenaber, 200.5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.