Orange County NC Website
2 <br />general locations of proposed future buildings, including building footprints, and the location <br />of infrastructure (parking, etc) that would serve the whole site. <br />Following Board adoption of the MOA, members would be solicited for the Fairview Public <br />Campus Master Plan Work Group, as reflected in the MOA. Appointments would be <br />considered in January/February, along with adoption of a Preliminary Concept Plan for the <br />site. The Master Plan design process is scheduled to begin in April. <br />FINANCIAL IMPACT: There is no cost associated with the consideration of the MOA. The <br />voter-approved 2001 Parks and Open Space band included $850,000 for development and <br />construction of Phase Two of Fairview Park. Of the total, $200,000 is currently available, <br />with the remainder scheduled for appropriation in FY 2005-06. <br />RECOMMENDATION(S): The Manager recommends that the Board adopt the <br />Memorandum of Agreement and authorize the Clerk's office to recruit Work Group <br />volunteers. <br />