Browse
Search
RES-2019-007 Resolution to adopt OC transportation projects
OrangeCountyNC
>
Board of County Commissioners
>
Resolutions
>
2010-2019
>
2019
>
RES-2019-007 Resolution to adopt OC transportation projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2019 11:28:23 AM
Creation date
2/8/2019 2:57:59 PM
Metadata
Fields
Template:
BOCC
Date
2/5/2019
Meeting Type
Regular Meeting
Document Type
Resolution
Agenda Item
6-a
Document Relationships
Agenda - 02-05-2019 6-a - Orange County Transportation Priority List for SPOT 6.0 FY 2022-2031 STIP
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 02-05-19 Regular Meeting
Minutes 02-05-2019 Regular Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
View images
View plain text
Revised Resolution # : 2019 - 007 <br /> ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS <br /> A RESOLUTION ENDORSING ORANGE COUNTY ' S LIST OF TRANSPORTATION PROJECTS <br /> FOR THE BURLINGTON = GRAHAM AND DURHAM = CHAPEL HILL = CARRBORO METROPOLITAN <br /> PLANNING ORGANIZATIONS ( BGMPO AND DCHC MPO ) AND THE TRIANGLE AREA RURAL <br /> PLANNING ORGANIZATION FOR CONSIDERATION OF INCLUSION IN THE 2022 — 2031 <br /> STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM <br /> WHEREAS , the North Carolina Board of Transportation ( BOT ) , every two years , prepares a Statewide <br /> Transportation Improvement Program ( STIP ) that identifies transportation projects to be implemented <br /> over the next ten years with State and Federal funding ; and <br /> WHEREAS , the North Carolina BOT solicits input for identifying transportation projects of local and <br /> regional importance to be included in the FY 2022 - 2031 STIP ; and <br /> WHEREAS , the BGMPO and TARPO Transportation Advisory Committees and the DCHC MPO <br /> Board are charged with the development of a Metropolitan Transportation Improvement Program <br /> ( MTIP ) or regional priority list ; and <br /> WHEREAS , Orange County is a member jurisdiction of the BGMPO , TARPO and DCHC MPO ; and <br /> WHEREAS , Orange County gives priority to identified safety needs on existing roads and bridges , to <br /> transportation projects that encourage alternatives to automobile travel , to projects that minimize <br /> adverse impacts on the natural environment and cultural sites , and to those projects that foster <br /> economic development in the County ' s designated Economic Development Districts , and <br /> WHEREAS , Orange County strongly encourages the North Carolina Department of Transportation <br /> ( NCDOT ) to design all highway projects , where appropriate , to accommodate bicycle and pedestrian <br /> traffic to provide alternative means of transportation that may result in reduced automobile traffic and <br /> related air and water impacts ; and <br /> WHEREAS , Orange County encourages the NCDOT to design all new or replacement bridges with <br /> sufficient clearance to allow wildlife to cross safely under them , and to allow pedestrian passage along <br /> any existing or planned trail - system connectors ; and <br /> WHEREAS , Orange County encourages the NCDOT to design all roads , bridges , and right - of-way so <br /> as to protect ecosystems and non - renewable resources ; and <br /> WHEREAS , Orange County has outlined its transportation needs within the BGMPO , TARPO and <br /> DCHC MPO planning areas in attachments to this resolution ; and <br /> NOW , THEREFORE , BE IT RESOLVED by the Orange County Board of Commissioners that the <br /> Board endorses the following list of transportation projects to be submitted for scoring by the State <br /> and to ultimately be considered for inclusion in the FY 2022 - 2031 STIP . <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).