Browse
Search
Agenda Item 1c - CHCCS Class Size Update
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2019
>
Agenda - 02-12-19 Schools
>
Agenda Item 1c - CHCCS Class Size Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2019 8:27:06 AM
Creation date
2/8/2019 8:17:43 AM
Metadata
Fields
Template:
BOCC
Date
2/12/2019
Document Type
Agenda
Document Relationships
Agenda - 02-12-2019 Joint Meeting with School Boards
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2019\Agenda - 02-12-19 Schools
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Staff has now conducted on-site visits to all elementary schools to refine and confirm survey <br /> information provided by principals wherein they identified space within each building that was <br /> presently being used for other purposes but could serve as full-sized classrooms if needed. <br /> Examples of space for reclamation as classrooms include such things as: <br /> • staff offices in areas developed from subdivided classrooms, <br /> • teacher work rooms, <br /> • book rooms and <br /> • moving foreign language to a cart. <br /> These proposals will be vetted by a staff work group reviewing instructional impacts. <br /> The information, summarized on the attached spreadsheet identifies 51 spaces that principals <br /> have identified as potential classroom space. Note these calculations contemplate the continued <br /> use of mobile units currently on school sites. While approximately 23 of the identified spaces <br /> would require some level of renovation, such as removing subdividing walls, installing <br /> equipment and adding furnishings, the physical classroom space to meet the legislated class size <br /> in 2020-21 appears to be available within current facilities. <br /> Identification of vacant or unused/underutilized spaces that could serve as classrooms is also a <br /> primary strategy in other districts. Some have considered art and music on carts. Please note <br /> this is NOT a consideration used in our analysis. Music and Art instruction would remain in <br /> their individual classrooms. At this time, it does not appear necessary for CHCCS to move <br /> toward more aggressive strategies used in other districts to meet the class size legislation, such <br /> as: <br /> • Assigning two Teachers of Record to one classroom when the classroom exceeds <br /> statutory limits <br /> • Blended grade classes <br /> • Significant increases in upper grade class sizes (size is not statutorily stipulated). <br /> Suggested next steps: <br /> • Receive Board feedback on the information presented and incorporate into future <br /> iterations of the implementation plan; and <br /> • Via utilization of a staff work group,prepare a business case articulating instructional and <br /> fiscal impacts, including, but not limited to facility renovations and a phasing plan for <br /> renovations to be presented to the Board at an upcoming meeting. <br /> FINANCIAL IMPACT: to be determined <br /> PERSONNEL IMPACT: to be determined <br />
The URL can be used to link to this page
Your browser does not support the video tag.