Browse
Search
Agenda - 11-16-2004-5j
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 11-16-2004
>
Agenda - 11-16-2004-5j
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:18:41 AM
Creation date
8/29/2008 10:26:00 AM
Metadata
Fields
Template:
BOCC
Date
11/16/2004
Document Type
Agenda
Agenda Item
5j
Document Relationships
Minutes - 20041116
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name:.Tames Grady <br />Address: 205 Rencher St, <br />City: Hillsbos~ough, N.C. 27278 <br />Phone Number: 245-1298 <br />Date:.Tuly 1, 2004 <br />ROOF: <br />1. histall a new galvanized roof shell over the existing roof:. <br />The contractor shall verify all measurements and dimensions. <br />Remove the chimney flue. Install new plumbing & exhaust vents, <br />Install all necessary trim & mini gutters. <br />WINDOWS: <br />Install a new matching kitchen window. Install new matching trim <br />on the interior. The window shall beweather-tight. <br />INSULATION: <br />Repair al] damaged & loose insulation in the crawlspace. Install <br />black board over the new insulation. Install treated wood strips & <br />6 mil poly. <br />2. Install a 6-mil vapor barrier in the crawlspace. <br />MECHANICAL: <br />Install a new propane heat/air system. The Mechanical Contractor <br />shall size the unit appropriately. Malce all electrical & mechanical <br />connections, Install a gas line from the propane tank to the unit. <br />Install a new thermostat in a central location. Install new floor <br />registers in all rooms. Install heat/air system to code. <br />PLUMBING: <br />Install a PVC cleanout cap on the sewer line located in the back <br />yard, <br />2. Install a new 40 gallon electric hot water located in the front <br />master bedroom closet. Make all plumbing & electrical connections <br />per code. <br />
The URL can be used to link to this page
Your browser does not support the video tag.