Browse
Search
Agenda - 11-16-2004-5j
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 11-16-2004
>
Agenda - 11-16-2004-5j
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:18:41 AM
Creation date
8/29/2008 10:26:00 AM
Metadata
Fields
Template:
BOCC
Date
11/16/2004
Document Type
Agenda
Agenda Item
5j
Document Relationships
Minutes - 20041116
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Bernice White <br />Address: 206 W. Orange St. <br />City: Hillsborough, N.C, 27278 <br />Phone Number: 644-7785 <br />Date: October 1, 2004 <br />HITCHEN/DINING & HALL: <br />10. Prepare the ceiling for a texture. Fill and tape all areas that attention. <br />Sand the new sheetroclc smooth. Prime the ceiling with astain- <br />block primer. Spray a texture on the kitchen, dining and hallway <br />ceilings. <br />11. Prepare all painted trim for paint. Prime all areas that need attention.. <br />Caulk all cracks in trim. Fill any nail holes with painters putty Paint <br />The trim with semi-gloss latex paint. The paint shall cover <br />completely. <br />19 <br />12. hrstall a washable wall covering on the kitchen wall over the base <br />cabinets. Remove the existing wall material. Install a PVC type wall <br />covering that is water resistant. brstall all necessary trim to finish off <br />the top of the wall material. <br />13. Install a new disappearing in the hallway. Install new matching <br />casing.. Prhne the casing and door with an oil based primer. Paint <br />the him and stairway door with semi-gloss latex paint. All paint <br />shall cover completely.. <br />14, Prepare the hall walls for paint. Repair any damaged areas with <br />sheetroclc filler.. Prime the walls with an oil bonding primer. Paint <br />the walls with flat latex paint. The paint shall cover° completely. <br />BATHROOM: <br />Remove the commode, Remove all particle board around the <br />commode. Install matching plywood, Prepare the floor for vinyl <br />histall ''/a" lauan plywood and a new vinyl floor. The vinyl to <br />cost not less than $ 14 sq yd. Install new shoe molding and metal <br />trim at the door opening. Prime and paint the shoe molding with <br />semi-gloss latex paint. The paint shall cover completely. <br />2. Prepare the sheetroclc walls and ceiling for paint. Re-mud all <br />exposed tapejoints and corners. Fill all nail holes. Sand all Eller <br />smooth. Prime all new sheetrock f Iler. Paint the walls and ceiling <br />with semi-gloss latex paint. The paint shall cover completely. <br />
The URL can be used to link to this page
Your browser does not support the video tag.