Browse
Search
Agenda - 11-16-2004-5j
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 11-16-2004
>
Agenda - 11-16-2004-5j
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:18:41 AM
Creation date
8/29/2008 10:26:00 AM
Metadata
Fields
Template:
BOCC
Date
11/16/2004
Document Type
Agenda
Agenda Item
5j
Document Relationships
Minutes - 20041116
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Narne: Bernice White 1 g <br />Address: 206 W. Orange St. <br />City: Hillsborough, N.C. 27278 <br />Phone Number: 644-7785 <br />Date: October 1, 2004 <br />I{ITCHEN/DINING & HALL: <br />1. Remove all cabinets, countertop and sink. Remove the existing <br />12"x 12" floor tiles. <br />2, Repair the sagging section of floor located near the sink and oven. <br />Install a dropped girder to help support the floor framing. The <br />dropped girder shall be a 4x6 treated. Install post jacks Oft OC, <br />The post,jacks shall rest on solid masonry approved by the Orange <br />County Inspection Department. <br />Remove the particleboard from the kitchen and dining room floor.. <br />Install matching plywood in both kitchen and dining rooms. <br />4. Prepare the floor for vinyl. hrstall '/~" lauan plywood and a new vinyl <br />floor. The vinyl to cost not less than $ 14 sq. yd. Install all necessary <br />metal trim in door openings. <br />5. Install new shoe molding in the kitchen, dining room and hallway. <br />Stain the shoe molding to match the existing paneling and trim, <br />6, hzstall factory made kitchen cabinets. The new cabinets shall match <br />the existing cabinet layout.. Cabinets to have hardwood fronts and a <br />factory finish. The cabinets shall have new hinges and hardware. <br />Install all necessary trim to finish off the wall cabinets. <br />7. Install new rolled back formica tops on all base cabinets. htstall all <br />necessary wall back-splash. All corner joints shall be tight to <br />prevent water intrusion. <br />8. Install a 9 lite exterior, insulated door unit in the kitchen. <br />The unit shall have an aluminum threshold and weather-stripping, <br />Install matching solid trim on the interior. Install an entry lockset <br />and double cylinder deadbolt, Key both loc]<set and deadbolt to <br />match the new front door unit. Stain the casing to match the existing <br />trim. <br />9. Install a baseboard door bumper for the kitchen door. <br />
The URL can be used to link to this page
Your browser does not support the video tag.