Browse
Search
Agenda - 11-16-2004-5j
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 11-16-2004
>
Agenda - 11-16-2004-5j
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:18:41 AM
Creation date
8/29/2008 10:26:00 AM
Metadata
Fields
Template:
BOCC
Date
11/16/2004
Document Type
Agenda
Agenda Item
5j
Document Relationships
Minutes - 20041116
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Bernice White <br />Address: 206 W. Orange St. <br />City: Hillsborough, N.C, 27278 <br />Phone Number: 644-7785 <br />October 1, 2004 <br />ELECTRICAL: <br />9. Remove the baseboard beat circuits from the service panel.. <br />Remove all baseboard wall them~ostats from the walls. Install <br />dummy covers over all existing controllers. <br />16 <br />PLUMBING: <br />Install a new double bowl stainless steel sirilc and single lever <br />faucet with sprayer in the kitchen.. The sink Faucet shall be of <br />Delta quality of°gre-approved equal. Tnstall new PVC drain line <br />assembly, strainer, supply lines and cutoffs. Malce all plumbing <br />coimections. <br />2_ Re-install the wall mount sink in the bathroom. Install a new <br />drain, supply lines and cutoffs. <br />Install a new handicap commode, supply line and cutoff. <br />Malce all plumbing coimections. <br />4. Install a new single lever combination tub/shower valve. The faucet <br />shall be of Delta quality orpre-approved equal. Make all plumbing <br />comiections. <br />5. Install ahand-held shower with two (2) clips. Install one clip at <br />normal shower height. Install the 2"~ wall clip approximately 40" <br />from the tub bottom. <br />6. Install a new PVC drain line assembly & trip lever for the tub. <br />Make all plumbing comiections. <br />ROOF <br />Install a shingle type ridge vent. Remove a three inch section <br />from the ridge before the vent is installed. <br />Repair the damaged roof section over the kitchen sink area. Remove <br />approximately 2 bundles of shingles. Remove approximately 1 sheet <br />or 32 sq ft of damaged sheathing, Install matching plywood, felt paper <br />and shingles. <br />
The URL can be used to link to this page
Your browser does not support the video tag.