Orange County NC Website
Capital Projects Completed in 2018- 19 <br /> • Carrboro Elementary <br /> — Replaced gym wood floor <br /> — Cooling Tower replaced <br /> — Multi Purpose Building HVAC unit (Spring Break) <br /> • Ephesus Elementary <br /> — Replaced the final 6 (of 13) HVAC rooftop units on the <br /> main building <br /> — Lighting converted to LED <br /> • Glenwood Elementary <br /> — Lighting to LED <br />