Browse
Search
2019-057-E Planning - Douglas Malinowski Lake Orange maintenance
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-057-E Planning - Douglas Malinowski Lake Orange maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 4:59:33 PM
Creation date
2/5/2019 9:28:51 AM
Metadata
Fields
Template:
Contract
Date
2/1/2019
Contract Starting Date
2/1/2019
Contract Ending Date
6/30/2019
Contract Document Type
Agreement - Services
Amount
$9,967.50
Document Relationships
2019-131-E Planning - Douglas Malinowski Lake Orange Maintenance Amendment 1
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2019-057 Planning - Douglas Malinowski Lake Orange maintenance
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: E39A7F34-1956-4F98-91AB-121A6B293FOE <br /> Practice Standards and Specifications <br /> PROTECTIVE MATTING <br /> Protective matting consists of an i mpervi ous cover secured to the soil surface <br /> in I i eu of vegetative cover. t is used to protect and stabi I i e the surface where <br /> the process of seedi ng or pl anti ng forms of vegetation may cause more erosi on <br /> and off si to sedi mentati on than appl i cati on of the mat. t i s a1 so used where a <br /> disturbed area is intended to lay fallow for a period of time before additional <br /> constructi on or I and di sturbance to es pl ace. f a pervi ous matti ng i s sell ected, <br /> a combination of vegetation and matting is required. eeds can be appl i ed <br /> prior to i nstal I ati on of the matting only after proper seedbed preparation <br /> has been provided. Iso, live sta es, dormant sprigs, and other vegetation <br /> forms can be inserted in the pervious matting once it has been i nstal I ed. Pre <br /> seeded pervious matting may be used for quic er root establishment and <br /> stabilization only if certified dating and germination guarantees are provided. <br /> The reviewing agency must approve all pre seeded matting on site prior to <br /> installation. Matting that incorporates plastic mesh and/or plastic twine should <br /> not be used in wetlands, riparian buffers or floodplains due to the potential <br /> of small animal mortality. See Section 6.17 for detailed specifications and <br /> recommended product applications. <br /> STABILIZATION IN WETLANDS, RIPARIAN BUFFERS, AND <br /> FLOODPLAINS <br /> and disturbing activity involving streams, wetlands or other waterbodies <br /> may also require permitting by the . . rmy orps of ngi neers or the . . <br /> i vi si on of ater ud i ty. pproval of an erosion and sedimentation control <br /> pl an i s condi ti oned upon the appl i cant s compl i ance wi th federal and tate <br /> water quality laws, regulations,and rules. dditi onal I y, a draft plan should be <br /> disapproved if implementation of the plan would result in aviolation of rules <br /> adopted by the nvironmental anagement ommission to protect riparian <br /> buffers along surface waters. are should be to en in selecting vegetative <br /> stabi I i ati on of wetlands and riparian buffers to comply with permitting <br /> requirements of other agencies,as wel I as provide adequate ground cover. <br /> Planning Considerations for Land Disturbing Activities Within Wetland, <br /> Riparian,and Floodplain Areas <br /> Wetlands,riparian areas,floodplains, and/or terrestrial areas between streams <br /> and uplands, serve to buffer surface water and provide habitat for aquatic and <br /> terrestrial flora and fauna. When cleared and disturbed, these sensitive areas <br /> are difficult to protect. Because of their proximity to water courses,relatively <br /> high ground water tables,and flooding potential,detailed analysis and design <br /> is necessary to determine the appropriate erosion control measures during <br /> construction. Determining the appropriate and most expeditious means of <br /> permanent vegetative stabi I i ati on in these areas requires equal I y detai I ed <br /> and ysi s and desi gn. The f of I owi ng condi derati ons for erosi on control and <br /> stabi I i ati on shoul d be to en i nto account duri ng the desi gn phase of the I and <br /> di sturbi ng pro ect where sensitive areas are i nvolved: <br /> • Obtain soil tests to determine the soil type, pH, texture and available <br /> nutri ents. <br /> • Based on the soil tests provide a schedule of nutrients and other soil <br /> amendments that wi I I be requi red. <br /> Rev. /0 6.11.7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.