Browse
Search
2019-057-E Planning - Douglas Malinowski Lake Orange maintenance
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-057-E Planning - Douglas Malinowski Lake Orange maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 4:59:33 PM
Creation date
2/5/2019 9:28:51 AM
Metadata
Fields
Template:
Contract
Date
2/1/2019
Contract Starting Date
2/1/2019
Contract Ending Date
6/30/2019
Contract Document Type
Agreement - Services
Amount
$9,967.50
Document Relationships
2019-131-E Planning - Douglas Malinowski Lake Orange Maintenance Amendment 1
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2019-057 Planning - Douglas Malinowski Lake Orange maintenance
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: E39A7F34-1956-4F98-91AB-121A6B293FOE <br /> Practice Standards and Specifications <br /> Fi ure 6.17e Channel Installation and Slope Installation; Washington State Ecology Department <br /> Longitudinal anchor Terminal slope and <br /> trench iL <br /> channel anchor trench <br /> 6" <br /> Stake at T-5' <br /> l <br /> intervals . <br /> . 41 _ 0 <br /> ry � ra <br /> 1'a ru <br /> b° - <br /> r° slot at 25' <br /> r° intervals <br /> rb � <br /> Initial channel Intermittent <br /> anchor trench check slot <br /> NOTE: <br /> 1. Check slots to be constructed per manufacturers specifications. <br /> 2. Staking or stapling layout per manufacturers specifications. <br /> Slope surface shall be smooth before If there is a berm at the top of <br /> placement for proper soil contact. slope,anchor upslope of the berm. <br /> Stapling pattern as Min. 2" " 1 Anchor in 6"x6" min. Trench <br /> per manufacturers overlap r� f • and staple at 12" intervals. <br /> recommendations. <br /> Min. 6"overlap. <br /> Staple overlaps <br /> max. 5"spacing. <br /> tight-allow Bring material down to a level area, <br /> Do not stretch blankets/matting g turn the end under 4 and staple at 12 <br /> the rolls to conform to any irregularities. intervals. <br /> For slopes less than 3H:iV, rolls Lime,fertilize,and seed before installation. Planting <br /> may be placed in horizontal strips. of shrubs,trees,etc. should occur after installation. <br /> Rev.6/06 6.17.11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.