Orange County NC Website
6 <br /> Attachment B <br /> Value Engineering Strategies <br /> Site Detention EAC Park Ops TOTAL <br /> Delete One of Three Multipurpose Rooms $ (384,800) <br /> Delete Precast Masonry Watertable to Brick $ (50,000) <br /> Delete Pop Up Roof at Entry/Sallyport $ (200,000) <br /> Replace Exterior Metal Wall Panels with Utility Brick $ (95,000) <br /> Contract Supply Video Visitation Equip $ (46,200) <br /> Reduce Parking by 25% $ (50,000) <br /> Delete Pop Up Roof at EAC $ (24,000) <br /> Convert West Hill Connector from Asphalt to Stone 1 $ (25,000) <br /> TOTAL VALUE ENGINEERING STRATEGIES 1 $ (25,000) $ (776,000) $ (74,000)1 1 $ (875,000) <br /> Reduction of 2,600 sq.ft.in Environment and Agriculture Center Included in Base Cost <br />