Browse
Search
Agenda - 02-05-2019 6-b - Northern Campus Project Update
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2019
>
Agenda - 02-05-19 Regular Meeting
>
Agenda - 02-05-2019 6-b - Northern Campus Project Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 4:11:10 PM
Creation date
1/31/2019 4:09:54 PM
Metadata
Fields
Template:
BOCC
Date
1/22/2019
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6-b
Document Relationships
2019-346-E AMS - HH Architects EAC contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
Agenda - 02-05-2019 Regular Board Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 02-05-19 Regular Meeting
Minutes 02-05-2019 Regular Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2019
R 2019-346 AMS - HH Architects EAC contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> At least three factors have contributed to this difference. First, these projects have been <br /> included in the Capital Investment Plan for several years without budget escalation to <br /> recognize inflationary cost pressures. The Detention Center has been in the CIP since 2012. <br /> The Environment and Agricultural Center was originally included in the CIP in 2014, and the <br /> Parks Operations Base was included in 2013. In recent years, construction costs have <br /> escalated by five to seven percent annually. Second, the current construction environment is <br /> highly competitive, so an inflationary adjustment of seven percent (7%) is added to the <br /> projected costs. Finally, the original budget did not assume site acquisition costs or the <br /> associated increase in site preparation for a larger site compared to the original detention <br /> center site owned by the State. <br /> Several strategies can be used to reduce the cost of the Northern Campus Project. <br /> Repurpose Previously Appropriated Funds: The County had previously borrowed funds for <br /> Detention Center Design. Of this amount, approximately $718,000 is remaining to apply to the <br /> current Northern Campus Project. <br /> Value Engineering: Value engineering strategies can be used to change architectural and <br /> aesthetic features without impacting how the facilities function. The project team has identified <br /> $875,000 in value engineering strategies as detailed in Attachment 2. <br /> Project Scope Reductions: Elements of the project may be reduced or eliminated to produce <br /> savings. The staff team has identified $438,000 in potential scope reductions as detailed in <br /> Attachment 3. As part of the scope reduction exercise, the number of Detention Center beds <br /> was examined. The Detention Center capacity could be reduced by forty (40) beds which <br /> would eliminate any capacity to house federal inmates and would immediately fill the available <br /> beds. The elimination of federal inmates would also reduce operating budget revenue by $1.6 <br /> million. <br /> Project Deferments: Projects that are currently programmed in the Capital Investment Plan <br /> could be eliminated or deferred to a later date when the County's debt capacity would <br /> accommodate them. The Southern Human Services expansion and a portion of the Cedar <br /> Grove Park Phase 2 expansion could be postponed for a savings of $2.6 million. Components <br /> of the Northern Campus project could also be postponed. Postponing the Environment and <br /> Agricultural Center and the Parks Operations Base would defer $7.75 million in construction <br /> costs. Given the County's current debt profile, debt capacity will begin to increase in FY2023- <br /> 24. See Attachment 4. <br /> Using a combination of these strategies, current project costs may be reduced. The following <br /> table outlines different strategy combinations in four (4) different options. <br />
The URL can be used to link to this page
Your browser does not support the video tag.