Browse
Search
Agenda - 02-05-2019 6-a - Orange County Transportation Priority List for SPOT 6.0 FY 2022-2031 STIP
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2019
>
Agenda - 02-05-19 Regular Meeting
>
Agenda - 02-05-2019 6-a - Orange County Transportation Priority List for SPOT 6.0 FY 2022-2031 STIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 4:11:03 PM
Creation date
1/31/2019 4:09:54 PM
Metadata
Fields
Template:
BOCC
Date
1/22/2019
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda - 02-05-2019 Regular Board Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 02-05-19 Regular Meeting
Minutes 02-05-2019 Regular Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2019
RES-2019-007 Resolution to adopt OC transportation projects
(Message)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br /> _ Current County priority as highway project <br /> Attachment 2:Draft Durham-Chapel Hill-Carrboro(DCHC)MPO Project List New Project <br /> Recommendations <br /> MPO/ AADT 2010- Crashes 2006- <br /> Map RPO Project Description/Need 2016 2016 2018 Results <br /> Staff OUTBoard <br /> Description:Modernize Old NC-86(SR-1009)from 1-40 to Eubanks Road(SR-1727)with NCDOT standard street cross- <br /> section 2E(60'row,1 T travel lane,5'bike lane,c&g,and sidewalk),add turn lanes at Davis Road(SR-1129),and New Hope north 5500- Total 208 <br /> Church Road(SR-1723) 6300 3 fatal <br /> DCHC Old NC-86(SR- 3 serious injury New Project <br /> Need:This project would provide multimodal and safety improvements along a north-south corridor for commuters travel New County <br /> 12 /TARP ovem between Hillsborough and Carrboro.This corridor is growing more unsafe with increasing accidents,three of them being fatal. 15 minor injury N/A Meets RPOprocess <br /> priority <br /> O Improvement** 24 possible injury <br /> Intersection improvements such as crosswalks and turn lanes will reduce crash frequencies and better manage traffic at key south 4500- 163 property SPOT process <br /> locations along the corridor.Traffic along this corridor will continue increasing making the area more hazardous and will 5000 damage <br /> eventually exceed the capacity of the existing road. <br /> Description:Improve current Dimmocks Mill Rd(#735154S)grade separation and close Bellvue St(#735152D)rail crossing County Priority <br /> Dimmocks Mill Need:The NCRR trestle on Dimmock's Mill currently does not allow trucks or pedestrians to safely cross underneath the Remain County <br /> 13 DCHC Trestle N/A 52.84 Statewide County priority <br /> railroad.By restructuring this trestle and reconfiguring the intersection,this area will provide a safe crossing between priority <br /> Improvements 8 Regional <br /> Hillsborough and destinations south for all users.Additionally,improving this trestle will allow large trucks to avoid using <br /> 22. <br /> Churton Street and will helpereate a back entrance to West Hillsborough. <br /> 2.86 Division <br /> Description:Improve the current trestle at Exchange Park Lane to accommodate Pedestrian traffic to support a pedestrian <br /> link from the proposed train station to downtown Hillsborough. County Priority <br /> Exchange Park Need:Currently,the NCRR trestle on Exchange Park Lane only accommodates one vehicle at a time and provides no safe N/A 2 1 Remain County <br /> 14 DCHC Lane Rail Trestle accommodations for pedestrians.Once the Hillsborough Train Station is constructed,Exchange Park Lane will be the only 6.5 Statewide County priority priority <br /> Improvements safe pedestrian route from the Train Station to Downtown Hillsborough.With substantial pedestrian demand forecast between Regional <br /> the Train Station and Downtown Hillsborough,creating a safe pedestrian environment is a crucial need in this area. 12.4.46 Division <br /> Description:Construct one additional lane between Patriot's Pointe Drive and New Grady Brown School Road(SR 1221)to <br /> include both pedestrian and bicycle improvements along the roadway.The 1-40 bridge would be widened to accommodate Total 43 Not submit to <br /> Orange Grove Rd. County priority <br /> Widening with both pedestrian and bicycle amenities and one additional travel lane. 1 serious injury NCDOT for P5.0 redefined as County priority <br /> 15 DCHC Bicycle and 4700-4600 5 minor injury highway as highway <br /> Pedestrian Need:There are significant safety issues along this stretch of roadway for motorists,but also for pedestrians and bicyclists. 6 possible injury No 20%local project project <br /> Improvements** Increased traffic along Orange Grove Road has led to a significant safety risks for all users of the roadway. 31 property match or local <br /> damage administration <br /> Description:Construct a roundabout at the intersection of Old NC 86,Dairyland Road(SR 1004/1113/1177),and Homestead 1999 Division County Priority Remain County <br /> . <br /> Road(SR 1777)in Calvander outside of Carrboro. priority <br /> Calvander Part of Old NC- <br /> priority <br /> DCHC DCHC Roundabout Need:Included at the request of the Orange Unified Transportation Board,this project would enhance safety at this N/A 86 modernization Coordinating SOT ID th Coordinating <br /> intersection and improve traffic flow,while also facilitating a safe left turns for bicyclists. H170 99) municipality with <br /> municipality <br /> Description:Provide one(1)bus to serve a new route for Orange Public Transportation providing service to major trip <br /> Orange County generators in Hillsborough <br /> Public Need:This project would provide a fixed route for underserved areas of Orange County(not being covered by the Removed from <br /> 17 DCHC Transportation Hillsborough Circulator)to major points of interest such as medical,employment,retail,municipal and social services.The N/A SPOT in favor of OCPT OCPT <br /> Circulator 11 project is currently in the unfunded category of the Orange County Bus and Rail Investment plan,yet remains a priority for our DO LRT <br /> Vehicles County Board of commissioners.It is only eligible for funding at the Division Needs tier. <br /> Description:Construct bicycle facilities on Old NC 86 from Farm House Road in Carrboro to Homestead Road(SR 1777). Not submit to County priority Remain County <br /> NCDOT for P5.0 priority <br /> 18 DCHC Old NC 86 Bike Need:Cyclists routinely use Old NC 86 as a key conduit for major rides in rural Orange County.Recent bicycle counts N/A o Coordinating <br /> Lanes conducted by NCDOT and NC State's ITRE indicate that 160 cyclists use the stretch of Old NC 86 between Hillsborough No 20/o local with Coordinating <br /> Road(SR 1009)and Homestead Road(SR 1777)each day with more on the weekends.This section is also particularly match or local municipality with <br /> narrow and includes a narrow gravel shoulder,which can present a hazard for cyclists.Widening this section to include administration municipality <br /> bicycle lanes will provide a safe space for bicyclists in this heavily trafficked bicycle corridor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.