Browse
Search
Agenda 8-e - Approval of a Construction Contract and Budget Amendment #5-A for the Remediation, Repair, and Reconstruction of the Waters Emergency Services Building
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2019
>
Agenda - 02-05-19
>
Agenda 8-e - Approval of a Construction Contract and Budget Amendment #5-A for the Remediation, Repair, and Reconstruction of the Waters Emergency Services Building
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 4:04:43 PM
Creation date
1/31/2019 3:55:04 PM
Metadata
Fields
Template:
BOCC
Date
1/22/2019
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8-e
Document Relationships
Agenda - 02-05-2019 Regular Board Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2019\Agenda - 02-05-19
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> [Departmental Use Only] <br /> TITLE ES Remediation <br /> FY 2018-19 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT OVER$250,000.00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement"), made as of the 6th day of <br /> February, 2019, by and between Bar Construction Company, Inc, (hereinafter called the "Contractor"), and <br /> Orange County, a political subdivision of the State of North Carolina, (hereinafter called the "County," <br /> "Orange County,"or"Owner"). <br /> WITNESSETH: <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> 1. CONTRACT DOCUMENTS; PRIORITY <br /> The Contract Documents consist of this Agreement, the General Conditions which are fully <br /> incorporated in this Agreement, the Request for Proposals, designer approved communications and/or field <br /> orders, the Proposal, Construction Documents and Drawings and Written Specifications. The Contract <br /> Documents form the Contract. In the event of any inconsistency between or among the Contract Documents <br /> the Contract Documents shall be interpreted in the following order of priority: <br /> a. This Agreement and incorporated General Conditions attached as Exhibit 1. <br /> b. Designer approved and stamped construction documents and drawings and written <br /> specifications. <br /> c. Designer approved communications and/or field orders. <br /> d. Request for Proposals and addenda thereto. <br /> e. Proposal. <br /> 2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform, and be fully responsible <br /> for all of the Work required by this Agreement within the time period stipulated in a written Notice-to-Proceed <br /> to be executed by the Contractor and Owner and in accordance with the following enumerated documents, <br /> which are made a part hereof as if fully contained herein: <br /> a. Construction Drawings prepared by Boomerang Design (Sheet G101, G102, G103, A001, <br /> A002, A101, A102, A301, R1, M000, M001, M002, M101, M102, M501, M601, M701, E000, <br /> E001, E101 dated 12/7/2018) <br /> b. Written specifications prepared by the Designer. <br /> c. Bar Construction Company, Inc. proposal dated January 18, 2019 which fully describes the <br /> Revised 12/18 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.