Orange County NC Website
8 <br /> Attachment D <br /> Other Capital Investment Plan Deferments <br /> Postpone Southern HS Expansion $ (1,555,500) <br /> Postpone Cedar Grove Park Phase 2 $ (1,100,000) <br /> TOTAL OTHER CIP DEFERMENTS $ (2,655,500) <br /> Northern Campus Project Deferments <br /> Site Detention EAC Parks Ops TOTAL <br /> Postpone EAC Construction $ (6,271,565) $ (6,271,565) <br /> Postpone Parks Ops. Construction $ (1,478,810) $ (1,478,810) <br /> TOTAL NORTHERN CAMPUS DEFERMENTS $ (7,750,375) <br />