Orange County NC Website
13 <br /> _ Current County priority as highway project <br /> Attachment 3:Draft Burlington-Graham Metropolitan Planning Organization(BGMPO)Project List New Project <br /> MPO/ Recommendation <br /> # RPO Project Description/Need AADT 2010-2016 Crashes 2006-2016 2018 Results <br /> (SPOT 5.0) Staff OUTBoard <br /> Description:Widen US-70 and improve intersections from Buckhorn Road(SR-1114)to Durham Total 1148 <br /> County with NCDOT standard street cross-section 4G(110'row,17.5'median,11'travel lanes,5' West 6400-6200 10 fatal <br /> bike lane,c&g,and sidewalk),add turn lanes and safety improvements at NC-86,St.Mary's Road <br /> DCHC/BG improvements— (SR-1002),Efland Cedar Grove Road(SR-1004),Frazier Road(SR-1310),Richmond Road(SR- 12 serious injury N/A New Project Not <br /> i mpro 1312),Brookhollow Road(SR-1324),Faucette Mill Road(SR-1328),Miller Road(SR-1555), 100 minor injury Recommended <br /> Lawrence Road(SR-1561),Palmers Grove Church Road(SR-1562),Pleasant Green Road(SR- East 12000-14000 220 possible injury <br /> 1567),Orange High School Road SR-1588,and N Scotswood Boulevard SR-2300. 706 property damage <br /> County Priority <br /> 2 BG Mattress Factory Description:Construct a new interchange at the existing grade-separated crossing of Mattress N/A County priority Remain County <br /> Road Interchange Factory Road and 1-85/1-40 Not submit to priority <br /> NCDOT for P5.0 <br /> Description:Extend Mattress Factory Road northward across East Washington Street and the North 2200-2000 <br /> Total 18 County Priority <br /> Mattress Factory 1 serious injury <br /> 3 BG Road Extension to NCRR/Norfolk Southern railroad right-of-way to intersect U.S.70 and close the existing railroad 3 minor injury Not submit to County priority Remain County <br /> U.S.70 crossover road connecting East Washington Street and U.S.70 approximately 240 feet to the east 1 possible injury NCDOT for P5.0 priority <br /> of the intersection of Mattress Factory Road and East Washington Street. South 1300-1800 13 property damage <br /> Total 124 County Priority <br /> Buckhorn Road <br /> Description:Widen Buckhorn Road from U.S.70 to West Ten Road(SR1144)to multiple lanes with North 6800-6600 2 serious injury Remain County <br /> 4 BG ( 1114) bicycle and pedestrian facilities with grade separation over railroad to US-70. 14 minor injury Not submit to County priority priority <br /> Widening— 18 possible injury NCDOT for P5.0 <br /> South 2500-3000 90 property damage <br /> Total 100 <br /> Lebanon Road East 2600—3000 2 serious injury <br /> Description:Intersection and safety improvements along Lebanon Road(SR-1306)from Mill Creek New County <br /> 5 DCHC/BG (SR-1306) Road(SR-1345)to Efland-Cedar Grove Road(SR-1004) 12 minor injury N/A New Project priority <br /> Improvements** 11 possible injury <br /> West 2100-2300 75 property damage <br /> Notes: <br /> *STI Law§136-189.11.Transportation Investment Strategy Formula section(d).(3).c.—The Department shall not provide financial support for independent bicycle and pedestrian improvement projects. <br /> **Sidewalk subject to NCDOT sidewalk cost share policy 40%Orange County for 1"5'of sidewalk,100%Orange County for any additional sidewalk. <br />