Orange County NC Website
2 <br /> The E-B-M AMP is not: <br /> o A proposal for, nor does it seek authorization for, funding right-of-way acquisition. <br /> o However, an AMP would be a necessary prerequisite to guide the investment to improve <br /> access, where necessary. <br /> o A collection of future road design and construction projects, nor does it include a schedule. <br /> o A guarantee that future development will occur or that roads will be built. <br /> Summary and key highlights from the E-B-M AMP <br /> Chapter 1 - Introduction — federal, state, and local regulations authorizing such plans including <br /> the process used in updating this plan. <br /> 0 2030 Orange County Comprehensive Plan Goals and Objectives. <br /> o Traffic trend details in addition to the 2017 Transportation Study results. <br /> Chapter 2 — Access Management Planning — Introduction of 2017 Transportation Study and <br /> recommendations for the planning area. This should be a focus area for review. <br /> o Includes Volkert, Inc., County staff and the recently adopted Mebane 2040 <br /> Comprehensive Transportation Plan (June 2018). <br /> Chapter 3 — Enforcement (aka Implementation) — lists the various resources, roles and <br /> responsibilities of state and local officials as well as property owners. <br /> o Includes process to amend the plan through developer initiated Traffic Impact Analysis <br /> Chapter 4 — Appendix — 2011 E-B-M AMP, 2017 Transportation Study and remarks collected <br /> throughout the planning process. <br /> o Contains survey results and specific comments provided by the public. <br /> A summary of key planning areas and responses to public comments are provided below. Also <br /> see Attachment 1, Public Questions & Comments. <br /> o West of West Ten Road and east of Mebane city limits. <br /> o Plan updated to avoid multiple stream crossings. <br /> o Intersection locations updated and requiring additional study. <br /> o Railroad crossings in Efland — Efland-Cedar Grove Road to Mt. Willing Road. <br /> o Plan not changed; carry forward from original adopted 2011 E-B-M AMP. <br /> o Key crossing identified by staff requiring additional study. <br /> o NCDOT requests Orange County conduct feasibility study through MPO. <br /> o Turner Street Extension through Center Street residential area. <br /> o Plan not changed; carry forward from original adopted 2011 E-B-M AMP. <br /> o Property zoned Local Commercial; UDO Section 3.4.10 requires property "have <br /> direct access to a street classified either as an arterial or collector". <br /> o Provide access to land locked parcels west of residential neighborhood. <br /> o US-70 and Preston Loop Subdivision <br /> o Plan not changed; carry forward from original adopted 2011 E-B-M AMP. <br /> o No recommendations on US-70 or through Preston Loop Subdivision. <br /> Appendix C of the plan provides comprehensive documentation of all public involvement <br /> activities throughout the planning process. <br /> Planning Board Review - September 5, 2018 <br /> Planning Board began reviewing the Draft E-B-M AMP. Following are key highlights from its <br /> initial review: <br />