Browse
Search
Agenda - 11-15-2004- item 1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 11-15-2004
>
Agenda - 11-15-2004- item 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:32:43 AM
Creation date
8/29/2008 10:25:43 AM
Metadata
Fields
Template:
BOCC
Date
11/15/2004
Document Type
Agenda
Document Relationships
Minutes - 20041115
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
review a more extensive list of short-term sustainability initiatives, particularly those that will <br />have impacts for the FY 2005-06 budget, <br />No Attachments <br />d. Longer Term School & County Initiatives Affecting sustainability: Beyond the short <br />term needs, the County must also consider sustainability in the longer term context. A variety of <br />other projects, programs, and other initiatives are likely to have operating budget impacts a <br />couple of years down the road, or beyond, These include start up costs far new schools, <br />County space needs, justice facilities, school funding equity, and the Durham Technical <br />Community College satellite campus, Again, staff will present a more extensive list of these <br />longer-term issues as part of the PowerPoint at the November 15 work session, <br />No Attachments <br />e. Temporary Personnel and Overtime Update: During the .June 2004 budget work <br />sessions, the Board asked staff to bring back more detailed information about expenditures for <br />overtime and temporary personnel. Staff have prepared reports on both of those topics, <br />including narrative and graphic representation, The Personnel Director will provide a brief <br />review of the major findings as part of the overall staff presentation, <br />Attachment E-1: Overtime Costs Report <br />Attachment E-2: Temporary Wage Expenditures <br />f. Likely School Construction Overruns: During the past several months, architects for <br />both school systems have advised the Boards of Education that the current budgets for major <br />school construction projects are likely to be insufficient to build the schools to the currently <br />contemplated designs, Escalating prices for concrete, steel, and fuel, among other factors, <br />have led to estimates that the costs to build OCS Middle School #3 and CHCCS High School #3 <br />are likely to be $6 million to $7 million (combined) higher than the project budgets approved by <br />the BOCC, <br />During the Board's October 25, 2004 work session, there was discussion about the likely project <br />budget shortfalls and about the possibility of reallocating some portion of the $12.8 million in <br />alternative financing currently earmarked in the County's debt issuance schedule for CHCCS <br />Elementary School #10. In light of the apparent slowing of enrollment growth for 2004-05 <br />compared to historical student growth, County and CHCCS staff have since met and reviewed <br />10-year student projections based on 20~h day CHCCS membership figures, That review <br />indicates that Elementary School #10 is likely to be needed between FY 2006-07 and 2009-10, <br />depending on whether current or revised (ta reflect State K-3 class size reductions) school <br />capacity figures are used, It must be stressed that the staff projections described here are <br />NOT the annual student projection updates that are performed under the Schools <br />Adequate Public Facilities Ordinance (SAPFO) machinery by County, schools, and Town <br />staff each year based on actual student membership as of November 15 each year. <br />THOSE projections, which will be calculated during the next month or two, will become <br />the basis for the 2005-15 Capital Investment Plan and will help determine in which <br />academic year new school facilities will be needed to meet the Level of Service (LOS) <br />standards established in the SAPFO machinery. <br />
The URL can be used to link to this page
Your browser does not support the video tag.