Orange County NC Website
6 <br />Draft 10/27/04 <br />- 2 Orange County Commissioners <br />- 2 Hillsborough Town Commissioners <br />- 1 member, Hillsborough Parks and Recreation Commission <br />- 1 member, Orange County Recreation and Parks Advisory Council <br />- 6 conununity citizens <br />Staff assistance to the Commmittee would be provided jointly by Orange County m:d the Town <br />of Hillsbor°ough, including the County and Torn Managers (or their designees), County <br />Open Space Design Specialist, County Recreation mrd Pm•ks Management Director, County <br />Environment and Resour°ce Coraervation Director, Town and County Planning Directors, <br />County and Town Engineers, County Purchasing Director, Courrry and Town Public Works <br />Directors, arrd other staff members as shall be deemed r:ecessarry. <br />Operating principles for the Master Plan Committee should include the following: <br />1, The Committee should review and consider the 1988 Concept Plan and determine its <br />validity and usefulness <br />2. The Committee should consider impacts on the County Parks Operations Base and <br />the Town and County Public Works facilities in developing the Master Plan, <br />incorporating these facilities into the scheme of the Master Plan as far as practical. <br />3. The Committee is asked to address and site the following as part of the Master Plan: <br />- Active and low-impact recreation facilities <br />- Provision of buffers for adjoining neighborhoods <br />- Protection of sensitive natural resource lands <br />- Reflect existing and proposed County Parks Operations Base and Public <br />Works facilities and the infrastructure necessary for these facilities <br />4. The Committee should not address the following facilities as part of the Master Plazr: <br />- Orange County Public Works expansion or a Town of Hillsborough Public <br />Works facility -beyond the Site infrastructure design and designating the <br />areas for such activities on the Master Plan <br />- County Parks Operations Base -beyond the Site infrastructure design and <br />designating the areas for such activities on the Master Plan <br />3. PROCESS FOR CONSTRUCTION OPERATION AND MAINTENANCE AND <br />PROGRAMMING OF SITE <br />The Master Plan Committee shall recommend the following with respect to a further <br />interlocal agreement between the Town and County: <br />1. the roles and responsibilities of the park and facility construction process; <br />2. The roles and responsibilities for operation & maintenance of the park, including <br />contributions for operation and maintenance; <br />3. The roles and responsibilities for programming of the park <br />4. If desired, mechanisms for funding of additional facilities in Master Plan beyond <br />the County's $850,000 for the park <br />5. Process for deciding how to embark on next phases,,joint agreement, etc, <br />