Browse
Search
Agenda - 11-03-2004-9c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 11-03-2004
>
Agenda - 11-03-2004-9c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 1:18:33 AM
Creation date
8/29/2008 10:25:39 AM
Metadata
Fields
Template:
BOCC
Date
11/3/2004
Document Type
Agenda
Agenda Item
9c
Document Relationships
2004 NS ERCD - Fairview Master Plan Memorandum of Agreement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2004
Minutes - 20041103
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Orangc County Trigon Project No 036-00-0161) <br />Hillsborough Landfill Site ,__- July 19, ZOOD <br />2) A deep foundation system of drilled piers penetrating the underlying natural soils and <br />partially weathered rock. - <br />3) A foundation system of GeopiersOO a stone columns extending into the underlying <br />natural soils and partially weathered rock. <br />Pavements and Athletic Fields <br />One possible improvement of the site is reportedly the construction of athletic fields and other <br />similar recreational facilities. Ball fields and soccer fields are not expected to be severely <br />impacted by settlement of the existing FILL soils, however, some future maintenance, including <br />regrading of the surface, can expected. Similarly, basketball and tennis courts could also be <br />supported by the existing FILL soil without experiencing major failures. However, it is quite <br />possible that the courts could experience some distress to the point that the pavement could crack <br />and the surface could become uneven. <br />The soils encountered at the boring locations should provide adequate support for pavements, <br />However, the subgrade tivill need to be prepared to support the pavement section including <br />placement of a compacted structural fill and possibly the use of geosynthetic reinforced earth <br />fills. <br />5.0 CLOSURE AND LIMITATIONS <br />Regardless of the thoroughness of the geoteclurical exploration, there is always a possibility that <br />substuface conditions will be different from those at the boring locations, that conditions will not be <br />as anticipated by the designers, or that the construction process will alter soil conditions. Therefore, <br />qualified geotechnical personnel should observe the prepazation, earthwork, and shallow foundation <br />consWction to confirm that the conditions anticipated in the design actually exist. <br />TRIGON ENGINEEIUNG CGNSULTi1NTS, ING Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.