Browse
Search
Agenda - 11-03-2004-9c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 11-03-2004
>
Agenda - 11-03-2004-9c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 1:18:33 AM
Creation date
8/29/2008 10:25:39 AM
Metadata
Fields
Template:
BOCC
Date
11/3/2004
Document Type
Agenda
Agenda Item
9c
Document Relationships
2004 NS ERCD - Fairview Master Plan Memorandum of Agreement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2004
Minutes - 20041103
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~i <br />COI`ISULTAI`ITS, [IYC. <br />700 Blue Ridge Road, Suite 101 ~ Raleigh, NC 27606 ^ (919) 755-5011 ~ FAX (919) 755-1414 <br />July I9, 2000 <br />Mr. Paul Thames <br />Orange County Manager's Office <br />200 South Cameron Street <br />Hillsborough, North Carolina 27278 <br />Reference: Report of Geotechnical Evaluation <br />Closed Hillsborough Landfill Site <br />Trigon Project No. 036-00-016D <br />Dear Mr. Thames: <br />Trigon Engineering Consultants, Inc. (Trigon) has completed the subsurface exploration and <br />geoteehnical evaluation of the closed landfill site located next to the Fairview Parlc in <br />Hillsborough. The work was performed in general accordance with our January 4, 2000, Proposal <br />for Environmental, Community Relations, and Geoteclmical Support (No 036-99-091-P). <br />The purpose of this study was to explore the general subsurface conditions, and to evaluate those <br />conditions with regard to future site development. Additionally, the investigation was to <br />delineate the approximate aerial extent of t11e refuse and rubble landfilled at the properly. This <br />report presents our findings, along with our conclusions and recommendations for design and <br />construction <br />Trigon appreciates the opportunity to provide our geoteclutical engineering services to Orange <br />County. Should you have any questions regarding this report, or require additional information, <br />please do not hesitate to contact our office, <br />Respectfully submitted, <br />TRIGON 1!/NGINGI;RING CONSULTANTS, INC. <br />Jo Gallagher, P.E! <br />P ject Manager <br />~~ <br />025257 <br />Nyle L. Hothem, P.E. <br />Senior Geotechnical Engineer <br />DLT:Ni.H <br />h:\ 0360c-IlprojccLS\2000\360001 G\I Gdlgcatech doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.