Browse
Search
2017-609 AMS - Town of Carrboro - Development Agreement Regarding Southern Branch Library
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
Interlocal Agreements
>
Carrboro
>
2017-609 AMS - Town of Carrboro - Development Agreement Regarding Southern Branch Library
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2018 10:30:21 AM
Creation date
1/28/2019 2:46:26 PM
Metadata
Fields
Template:
Contract
Date
12/4/2017
Contract Starting Date
12/4/2017
Contract Document Type
Agreement
Agenda Item
10/17/17; 6-c
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C <br />203 5. Greensboro Development Agreement <br />Elemenis of Value <br />Land <br />1 Properly <br />2 Existing environmental remediafion, monitoring <br />Adequate Structured Parldng <br />Desl g n/Testingl Perml"i ngt Enthlements/Fees <br />5 Preliminary vision planning <br />6 Zoning/Land Use application fees <br />7 Utility( infrastructure analysis fees <br />8 Utifityrinfrastructure impart fees <br />9 Designer Fees for Carrboro Planning Process /Approvals <br />10 Preliminary site assessment fees <br />11 Suslainability /Energy Modeling and Analysis Fees <br />12 Site/Civil/Landscape design, CA fees, design contingencies <br />13 Building Shell, Core Area design, Construction Administration, design contingencies <br />14 Occupant Upfh design, Construction Administration, design contingencies <br />She Topics <br />15 De- construction <br />16 Clearing, grading, erosion control <br />17 Subsurface conditions /unsuhable soils <br />18 She stonnwater management system <br />13 Retaining wall /safely railing <br />14 Onshe walkways / specialty surfacing <br />16 Temporary staging / stockpiling areas <br />17 Building Shell Ulilhy services to identified demarcation points <br />18 Utility connection fees <br />19 Site lighting <br />20 Shell marquis signage / exterior wayfinding signage <br />21 Amenities / site furniture / bike parking <br />22 Solid waste / recycling facilities <br />23 Bus stop / shelter / she considerations <br />24 Sanitary lift station requirements (it necessary) <br />25 Site construction contingencies <br />Off -Site Topics <br />26 Off -site roadway or pedestrian improvements <br />27 Oh -site building shell utility improvements (lo properly line) <br />28 Off -site Bicycle pathway considerations <br />29 Off -site construction material staging area costs <br />Off -site contingencies <br />Shell, Core & Identified Common Area Construction <br />30 Foundation System <br />31 Roof System, Building drainage leaders /surface drainage piping <br />32 Core elevator, shaft and equipment <br />33 Core & identified Common Area potable water service / backf ow preventer <br />34 Core & identified Common Area sanitary sewer service <br />35 Core & identified Common Area paver transformer / service <br />36 Core & identified Common Area natural gas service <br />37 Core & identified Common Area fire protection shell components <br />38 Core & identified Common Area sustainable systems installation <br />39 Core & identified Common Area upfit construction <br />40 Core & identified Common Area security /access /AV /teledata <br />41 Coe & identified Common Area fumiture, fixtures, and equipment <br />42 Shell, Core & identified Common Area contingencies <br />Exclusive Condominium Space Interiors <br />43 Upfit branch buildng systems <br />44 Upfit (architectural components) <br />45 Upfit security /access /AV /leledata <br />46 Upfit furniture, fixtures, and equipment <br />47 Upfit contingencies <br />Other Costs <br />48 Legal Costs <br />49 Financing Costs <br />A" al share <br />Town Count ual I Pro ortional Notes <br />Includes discussions on level of finish, appearance, aesthetics <br />Includes geolechnical, environmental, cultural, traffic studies <br />High performance building standards analysis, cost- benefit analysis <br />Occupants pay for upfil costs <br />II necessary in design <br />If separately metered, per condominium owner <br />All man systems to identified demarcations within exclusive occupant <br />interior spaces. <br />From site demarcation to Core & Common Area facilities <br />Each party bears all costs of exclusive space needs <br />Branch systems include electrical, mechanical, plumbing, and fire protection within exclusive areas <br />Walls, doors, ceilings, floor coveringltrealmenl, lighting, etc. <br />Each party bears its own costs <br />rho Parties agree as follows: <br />The Town's costs pursuant to this Agreement shall not exceed 59,600,000.00 (Nine Million Six Hundred Thousand Dollars). <br />Any costs in excess of this amount must be authorized by the Town of Carrboro Alderpersons through a written amendment to the Agreement. <br />The County's costs pursuant to this Agreement shall not exceed 57,547,500.00 (Seven Million Five Hundred Forty seven Thousand Five Hundred Dollars). <br />Any costs In excess of this amount must be authorized by the Orange County Board of Commissioners through a written amendment to the Agreement. <br />'proportional basis for these items is anticipated to be determined in the design phase as building elements and systems are more specifically known, with the cost sharing likely to be less than equal but more than on a proportional square footage basis. <br />
The URL can be used to link to this page
Your browser does not support the video tag.