C. Before commencement of construction of the Project, the County shall <br /> obtain all easements,permits, privileges and assurances necessary for the construction and <br /> operation of the sewer system; all easements shall conform with the exclusive easements <br /> customarily required by OWASA for construction of such projects, and shall be assignable <br /> without the consent of the underlying fee owner to OWASA. Either OWASA or the County <br /> shall execute permit applications and provide necessary documentation to obtain all permits and <br /> authorizations necessary for construction of the Project improvements and connection to the <br /> existing OWASA wastewater collection system. <br /> d. Using the County's determinations described above, OWASA shall <br /> undertake as the County's agent to solicit bids, select the most appropriate bidder, and award a <br /> Contract for construction and completion of the Project. The consulting Engineer will prepare <br /> bid documents (plans and specifications) and will use OWASA's standard bidding procedures to <br /> select and contract with Contractor(s)to build the Project. <br /> e. The Contract awarded for construction and completion of the Project shall <br /> name the County as Owner of the improvements to be constructed, and as the party responsible <br /> for payment for the improvements being constructed, and shall recognize and identify OWASA <br /> as the County's agent authorized to supervise, direct, and otherwise see that the Project is <br /> completed within the terms of the Contract. All insurance, warranties, indemnities, and other <br /> obligations undertaken or benefits and coverages to be provided by the Contractor under the <br /> Contract shall inure to the benefit of both the County as Owner, and OWASA as the County's <br /> agent in all matters pertaining to or arising out of performance of the Contract, as their interests <br /> may appear. <br /> Page 3 of 9 <br />