Orange County NC Website
/ 20 <br /> i <br /> f <br /> Table of Contents <br /> Section 1 Introduction <br /> 1.1 Project Background and Objectives...............................................................................................................1-1 <br /> 1.2 Project Area..............................................................................................................................................................1-1 <br /> 1.3 Scope of Stud ..............................................1-2 <br /> 1.4 Report Format........................................................................................................................................................1-3 <br /> Section 2 Water Demand and Wastewater Flow Projections <br /> ' 2.1 Land Use Assumption...:.......................................................................................................................................2-1 <br /> 2.2 Water Demand Projections...... ....................................................................................................................2-3 <br /> 2.3 Wastewater Flow Projections..... <br /> 2.4 Phasing and Summary.........................................................................................................................................2-5 <br /> Section 3 Evaluation of Existing Water Infrastructure within Eno EDD <br /> 3.1 Existing Infrastructure........................................................................................................................................3-1 <br /> 3.2 Water Distribution System Evaluation.........................................................................................................3-1 <br /> 3.2.1 Model Verification.....................................................................................................................................3-1 <br /> 3.2.2 Model Set-Up and Evaluation Criteria...........................................................................................3-1 <br /> 3.2.3�Hydraulic Capacity Analysis. .3-3 <br /> 3.2.4 Summary.......................................................................................................................................................3-4 <br /> Section 4 Proposed Wastewater Collection System within the Eno EDD <br /> 4.1 Existing Wastewater Collection System....................................................................................................4-1 <br /> 4.2 Eno EDD Physical Features. ....................................................4-1 <br /> 4.2.1 Roadways......................................................................................................................................................4-1 <br /> 4.2.2 Hydrography...............................................................................................................................................4-2 <br /> 4.2.3 Topography........................................................... <br /> ....................................................................................................4-4 <br /> 4.3 Design Criteria........................... ..................... 4-4 <br /> 4.3.1 Priority Service Areas.......................................................................................................................... <br /> .....4-4 <br /> 4.4 Proposed Wastewater System..........................................................................................................................4-5 <br /> 4.4.1 Peaking Factor.............................................................................................................................................4-5 <br /> 4.4.2 Gravity Sewer..............................................................................................................................................4-5 <br /> 4.4.2.1 Pipe Depth Analysis................................................................................. . .............................4-5 <br /> 4.4.2.2 Pipe Capacity.............................................................................................................................4-10 <br /> 4.4.3 Eno EDD Pump Station............................................ .......................................................................4-12 <br /> 4.4.3.1 Pump Station Location..........................................................................................................4-12 <br /> 4.4.3.2 Pump Station Capacity...........................................................................................................4-13 <br /> 4.4_.4 Force Main.................................................................................................................................................4-13 <br /> th i <br />