Browse
Search
Agenda - 11-03-2004-5d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 11-03-2004
>
Agenda - 11-03-2004-5d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 1:19:55 AM
Creation date
8/29/2008 10:25:30 AM
Metadata
Fields
Template:
BOCC
Date
11/3/2004
Document Type
Agenda
Agenda Item
5d
Document Relationships
2004 NS Purchasing - Engineering Services to Design Emergency Management Building HVAC Replacement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2004
Minutes - 20041103
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C>. Conduct site visits during construction to observe the work and assist with coordination or <br />problem resolution. Frequency of\~isits is estimated at two per week. <br />7 Conduct Pre-Bid. Pre-Conswction, and Mmnhly Constnrction Conferences <br />R Conduct pre-final. finch and ond-of-warranty inspections <br />9. Reciew Owner's Mamrals and as-built drnvings submitted h}' the Contractor <br />]0.. Prepare Electronic Record Dmw~ings from contractor-furnished as-built marked prints <br />I I Support Owner during dte Contrtaors' one-ye<'tr tvamuny period to resoh'e any problems with <br />equipment manufacturers.. suppliers. system operation. balancing. etc <br />.ADDITIONAL SERVICES: '17tc lump sum fee proposed above does not include sen'ices such as those <br />listed below. We will propose additional fees for such scn~iccs upon request. <br />I Design of additional elements not related to the HVAC systems replacement, which may be <br />generated by the Ormrge County Inspections Deparuncnl. Examples would be additional fire <br />alarm. fire sprinkler systems, fire rating of existing construction, etc <br />2 Conslnrction administration services which extend beyond the established Contract Completion <br />Date, through no f:mlt of the Designer. including defudt of any Contractor. <br />3 Modifying drawings and specifications as a result of Contrtctors' equipment substitutions, faihrre <br />to coordinate or sequence the work, or other ftudt of the Contractor(s) <br />BILLINGS/PAYMENTS: hw'oices will be presented mmuhh'. based on progress during the month. <br />Payments wilt 6c due on a net 30-dw basis Piru~ncing charges on balance beyond i0 days will be I-1/2%~ <br />per month (1K"/" APR) If we should have to seek Icgal action to effect collection, and we prevail in <br />litigation, then all costs associated with collecting overdue accounts will be recoverable, I f payments arc <br />withheld or disputed. then we retain the right to suspend further scR'iccs until the account is curzcnt <br />MISCELLANEOUS PROVISIONS: <br />I If there is a project sign and/or building plaque. Ihcn Rcccc. Notand. <~; McElmlh will be <br />appropriately listed <br />Submitted by: <br />REECE. NOL.AND cY: McELRATH. INC <br />_._...;~~~~_.. v <br />Stcpben C Kaufman. PE <br />Accepted by: <br />Semember lt). 200d _ <br />Date <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.